Mingo Logan Coal LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $432.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
Mountaineer II Mine · 460902930 CFR 75.370(a)(1) · $336.00 proposed penalty
Spot Inspections
Mountaineer II Mine · 4609029103(i) · 5.5 on-site hours reported
Health Technical Investigation
Cardinal Preparation Plant · 46090467.0 on-site hours reported
Mine ventilation plan; submission and approval.
Mountaineer II Mine · 460902930 CFR 75.370(a)(1) · $336.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $1,126.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $193.00 proposed penalty
Protection from falls of roof, face and ribs.
Mountaineer II Mine · 460902930 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
First-aid equipment; location; minimum requirements.
Mountaineer II Mine · 460902930 CFR 75.1713-7(a) · $226.00 proposed penalty
Condition and examination of firefighting equipment.
Mountaineer II Mine · 460902930 CFR 75.1100-3 · $245.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $151.00 proposed penalty
Power wires; support.
Mountaineer II Mine · 460902930 CFR 75.516 · $755.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $432.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $432.00 proposed penalty
Roof bolting.
Mountaineer II Mine · 460902930 CFR 75.204(c)(1) · $151.00 proposed penalty
Loading and haulage equipment; operation.
Mountaineer II Mine · 460902930 CFR 77.1607(cc) · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mountaineer II Mine · 460902930 CFR 75.1731(a) · $245.00 proposed penalty
Underground electrical installations.
Mountaineer II Mine · 460902930 CFR 75.340(a)(1)(ii) · $226.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mountaineer II Mine · 460902930 CFR 75.1731(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mountaineer II Mine · 460902930 CFR 75.1731(b) · $151.00 proposed penalty
Fire suppression systems; additional requirements.
Mountaineer II Mine · 460902930 CFR 75.1103-10 · $226.00 proposed penalty
Type and quality of firefighting equipment.
Mountaineer II Mine · 460902930 CFR 75.1100-1(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.