Mingo Logan Coal LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protection from falls of roof, face and ribs.
Mountaineer II Mine · 460902930 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
Mountaineer II Mine · 460902930 CFR 75.601-1 · $226.00 proposed penalty
Deenergization of self-propelled electric face equipment installation requirements.
Mountaineer II Mine · 460902930 CFR 75.523-1(a) · $336.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $193.00 proposed penalty
Installation of high-voltage transmission cables.
Mountaineer II Mine · 460902930 CFR 75.807 · $755.00 proposed penalty
Ventilation controls.
Mountaineer II Mine · 460902930 CFR 75.333(c)(3) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Mountaineer II Mine · 460902916.8 on-site hours reported
Mine ventilation plan; submission and approval.
Mountaineer II Mine · 460902930 CFR 75.370(a)(1) · $151.00 proposed penalty
Air quality.
Mountaineer II Mine · 460902930 CFR 75.321(a)(1) · $151.00 proposed penalty
Spot Inspections
Mountaineer II Mine · 4609029103(i) · 2.5 on-site hours reported
Surface installations; general.
Mountaineer II Mine · 460902930 CFR 77.200 · $151.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
Mountaineer II Mine · 460902930 CFR 75.601-1 · $151.00 proposed penalty
Electrical connections or splices; suitability.
Mountaineer II Mine · 460902930 CFR 75.514 · $755.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $504.00 proposed penalty
Criteria—Self-propelled personnel carriers.
Mountaineer II Mine · 460902930 CFR 75.1403-6(a)(3) · $226.00 proposed penalty
Ventilation controls.
Mountaineer II Mine · 460902930 CFR 75.333(e)(1)(ii) · $226.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $151.00 proposed penalty
Non-Injury Accident Investigation
Mountaineer II Mine · 460902914.8 on-site hours reported
Violation — cited standard not reported
Mountaineer II Mine · 4609029Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $1,126.00 proposed penalty
Permissible electric face equipment; maintenance.
Mountaineer II Mine · 460902930 CFR 75.503 · $366.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $432.00 proposed penalty
Escapeways; bituminous and lignite mines.
Mountaineer II Mine · 460902930 CFR 75.380(d)(1) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Condition and examination of firefighting equipment.
Mountaineer II Mine · 460902930 CFR 75.1100-3 · $245.00 proposed penalty
Spot Inspections
Mountaineer II Mine · 4609029103(i) · 4.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.