Mettiki Coal WV, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
Mountain View Mine · 460902830 CFR 75.1731(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Mountain View Mine · 4609028255.5 on-site hours reported
Ventilation Technical Investigation
Mountain View Mine · 46090287.5 on-site hours reported
Ventilation controls.
Mountain View Mine · 460902830 CFR 75.333(d)(3) · $151.00 proposed penalty
Ventilation controls.
Mountain View Mine · 460902830 CFR 75.333(e)(1)(i) · $151.00 proposed penalty
Fall of face/rib/pillar/side/highwall
Mountain View Mine · 4609028Days away from work only
Accident narrative
EE walked beside the bolter in the bolted entry to throw cable out of the way.A rock fell from the rib 8' high measuring 16" long by 2.5" wide.The rock hit the EE on the left forearm then the left boot.When it struck EEs boot, the rock went through the top of the LaCross Metatarsal guard mining boot causing a laceration to the top of EEs foot around the toes.EE got 2 pins/sutures.
Other safeguards.
Mountain View Mine · 460902830 CFR 75.1403
Entrapment
Mountain View Mine · 4609028Accident only
Accident narrative
F-Mine Elevator broke down with 7 employees on it. All employees were able to get off with no injuries reported. This incident was immediately called in to the hotline.
Mine ventilation plan; submission and approval.
Mountain View Mine · 460902830 CFR 75.370(a)(1) · $165.00 proposed penalty
Weekly examination.
Mountain View Mine · 460902830 CFR 75.364(b)(4) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
Mountain View Mine · 460902830 CFR 75.380(d)(1) · $336.00 proposed penalty
Protection from falls of roof, face and ribs.
Mountain View Mine · 460902830 CFR 75.202(a) · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
Mountain View Mine · 460902830 CFR 75.370(a)(1) · $165.00 proposed penalty
Verbal Hazard Complaint Inspections
Mountain View Mine · 46090287.5 on-site hours reported
Cable fittings; suitability.
Mountain View Mine · 460902830 CFR 77.505 · $336.00 proposed penalty
Weekly examination.
Mountain View Mine · 460902830 CFR 75.364(b)(1) · $755.00 proposed penalty
Ventilation controls.
Mountain View Mine · 460902830 CFR 75.333(h) · $226.00 proposed penalty
Compressors.
Mountain View Mine · 460902830 CFR 75.344(a)(2) · $226.00 proposed penalty
Weekly examination.
Mountain View Mine · 460902830 CFR 75.364(g) · $226.00 proposed penalty
Atmospheric monitoring systems.
Mountain View Mine · 460902830 CFR 75.351(d)(2) · $226.00 proposed penalty
Preshift examination at fixed intervals.
Mountain View Mine · 460902830 CFR 75.360(g) · $226.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mountain View Mine · 460902830 CFR 75.1731(a) · $226.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
Mountain View Mine · 460902830 CFR 75.1714-3(b) · $398.00 proposed penalty
Ventilation controls.
Mountain View Mine · 460902830 CFR 75.333(h) · $755.00 proposed penalty
Accumulation of combustible materials.
Mountain View Mine · 460902830 CFR 75.400 · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.