Melvin Stone Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Portable Plant 2202-1 · 33047445.0 on-site hours reported
Regular Safety and Health Inspection
Main Melvin · 330011126.5 on-site hours reported
Safe access.
Main Melvin · 330011130 CFR 56.11001 · Significant and substantial (S&S) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Main Melvin · 330011130 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Main Melvin · 330011130 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Main Melvin · 330011130 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Main Melvin · 330011130 CFR 50.30(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Huber Heights · 33045622.0 on-site hours reported
Spot Inspection
Main Melvin · 33001110.0 on-site hours reported
General instructions for completing MSHA Form 7000-1.
Main Melvin · 330011130 CFR 50.20-1 · $151.00 proposed penalty
Regular Safety and Health Inspection
Williamsport Plant · 330439224.8 on-site hours reported
Construction and maintenance of guards.
Williamsport Plant · 330439230 CFR 56.14112(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Bowersville · 330447916.8 on-site hours reported
Extinguisher recharging or replacement.
Bowersville · 330447930 CFR 56.4203 · $151.00 proposed penalty
Handling of materials
Main Melvin · 3300111Days away from work only
Accident narrative
On 11/20/2025 at Melvin Stone, employees were removing the bucket from EX1200 (22030002). When the final pin was pressed out, the stick settled and caught EE's left hand between the stick and bucket cylinder. First aid was given and EMS transported EE for treatment. No fractures reported.
Site-specific hazard awareness training.
Plano Road · 330439530 CFR 46.11(a) · $168.00 proposed penalty
Regular Safety and Health Inspection
Plano Road · 330439514.0 on-site hours reported
Examination of working places.
Plano Road · 330439530 CFR 56.18002(a) · $151.00 proposed penalty
Overhead drive belts.
Plano Road · 330439530 CFR 56.14108 · $151.00 proposed penalty
Moving machine parts.
Main Melvin · 330011130 CFR 56.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Main Melvin · 330011129.5 on-site hours reported
Regular Safety and Health Inspection
Portable Plant 2202-1 · 33047444.5 on-site hours reported
Handling of materials
Main Melvin · 3300111Days away from work only
Accident narrative
Employee smashed finger in the door while exiting the crusher tower after operating rock breaker.
Regular Safety and Health Inspection
Circleville · 330432912.0 on-site hours reported
Cited standard: 30 CFR 56.12088
Circleville · 330432930 CFR 56.12088 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.