MC Mining LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Electric equipment and circuits; overload and short circuit protection; minimum requirements.
Preparation Plant · 151773330 CFR 77.506-1
Grounding metallic sheaths, armors, and conduits enclosing power conductors.
Preparation Plant · 151773330 CFR 77.700
Electric wiring and equipment; installation and maintenance.
Preparation Plant · 151773330 CFR 77.516
Electric wiring and equipment; installation and maintenance.
Preparation Plant · 151773330 CFR 77.516
Inspection and cover plates.
Preparation Plant · 151773330 CFR 77.512
Cable fittings; suitability.
Preparation Plant · 151773330 CFR 77.505 · Significant and substantial (S&S)
Electric equipment; examination, testing, and maintenance.
Preparation Plant · 151773330 CFR 77.502
Travelways at surface installations.
Preparation Plant · 151773330 CFR 77.205(e)
Dust accumulations in surface installations.
Preparation Plant · 151773330 CFR 77.202
Regular Safety and Health Inspection
Preparation Plant · 151773353.8 on-site hours reported
Handtools (nonpowered)
Preparation Plant · 1517733Days away from work only
Accident narrative
Employee was using a hammer to tighten a lock ring on a bearing. A piece of metal broke and lodged in the groin area. Surgery was attempted to remove the metal without success.
Spot Inspection
Preparation Plant · 15177335.3 on-site hours reported
Machinery and equipment; operation and maintenance.
Preparation Plant · 151773330 CFR 77.404(a) · Significant and substantial (S&S)
Impoundment Spot Inspection
Preparation Plant · 15177336.0 on-site hours reported
Surface installations; general.
Preparation Plant · 151773330 CFR 77.200 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Preparation Plant · 151773330 CFR 77.502 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Preparation Plant · 151773330 CFR 77.502 · $151.00 proposed penalty
Loading and haulage equipment; installations.
Preparation Plant · 151773330 CFR 77.1605(b) · $151.00 proposed penalty
General instructions for completing MSHA Form 7000-1.
Preparation Plant · 151773330 CFR 50.20-1 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Preparation Plant · 151773330 CFR 77.502 · $151.00 proposed penalty
Regular Safety and Health Inspection
Preparation Plant · 1517733140.5 on-site hours reported
Impoundment Spot Inspection
Preparation Plant · 15177336.0 on-site hours reported
Warning signs; smoking and open flame.
Preparation Plant · 151773330 CFR 77.1102 · $151.00 proposed penalty
Cable fittings; suitability.
Preparation Plant · 151773330 CFR 77.505 · $151.00 proposed penalty
Surface installations; general.
Preparation Plant · 151773330 CFR 77.200 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.