Martin Marietta Materials, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Safety defects; examination, correction and records.
Marshall Quarry · 230009930 CFR 56.14100(b) · $151.00 proposed penalty
Construction and maintenance of guards.
Marshall Quarry · 230009930 CFR 56.14112(a)(1) · $151.00 proposed penalty
Electrical conductors.
Washita Quarry · 340204930 CFR 56.12004 · $209.00 proposed penalty
Insulation and fittings for power wires and cables.
Nolanville Mine & Mill · 410178630 CFR 56.12008 · Significant and substantial (S&S) · $288.00 proposed penalty
Verbal Hazard Complaint Inspections
Lowell Mine & Mill · 08011211.0 on-site hours reported
Regular Safety and Health Inspection
Red Oak Quarry · 090006913.5 on-site hours reported
Regular Safety and Health Inspection
Malcom Mine · 130011224.5 on-site hours reported
Regular Safety and Health Inspection
Marshall Quarry · 23000996.3 on-site hours reported
Electrical conductors.
AMES MINE · 130001430 CFR 57.12004 · $151.00 proposed penalty
Regular Safety and Health Inspection
AMES MINE · 130001474.0 on-site hours reported
Regular Safety and Health Inspection
Nolanville Mine & Mill · 410178624.3 on-site hours reported
Unguarded conveyors with adjacent travelways.
AMES MINE · 130001430 CFR 57.14109(a) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Nolanville Mine & Mill · 410178630 CFR 56.12008 · $151.00 proposed penalty
Housekeeping.
Nolanville Mine & Mill · 410178630 CFR 56.20003(a) · Significant and substantial (S&S) · $288.00 proposed penalty
Construction and maintenance of guards.
Nolanville Mine & Mill · 410178630 CFR 56.14112(a)(1) · Significant and substantial (S&S) · $288.00 proposed penalty
Combustible waste.
Nolanville Mine & Mill · 410178630 CFR 56.4104(a) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
O'Neal Quarry & Mill · 01000031.0 on-site hours reported
Regular Safety and Health Inspection
Martin Marietta - Piney River Quarry · 440003516.0 on-site hours reported
Compliance Follow-up Inspection
CAYCE QUARRY · 38000161.0 on-site hours reported
Regular Safety and Health Inspection
New Melle Mine · 230204341.5 on-site hours reported
Regular Safety and Health Inspection
Chattanooga Quarry · 400315920.3 on-site hours reported
Regular Safety and Health Inspection
DOSWELL QUARRY · 440004524.0 on-site hours reported
Inspection and cover plates.
New Melle Mine · 230204330 CFR 57.12032 · $151.00 proposed penalty
Machinery
Martin Marietta - Woodville Lime & Stone · 3300156No dys awy frm wrk,no rstr act
Accident narrative
Left hand caught between tube and chute wall- worker was removing old scrape cleaner- tube was stuck, then broke free, worker did not expect tube to slide forward toward left hand- when it slid tube caught left hand between chute wall and tube- received 7 stitches between left index finger knuckle and middle finger knuckle- no broken bone
Regular Safety and Health Inspection
Yellow Medicine Quarry · 210003311.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.