Marshall County Coal Resources, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 6.8 on-site hours reported
Criteria—Belt conveyors.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-5(g) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
MARSHALL COUNTY MINE · 460143730 CFR 75.370(a)(1) · $151.00 proposed penalty
Fall of roof or back
MARSHALL COUNTY MINE · 4601437Accident only
Accident narrative
An un-planned roof fall occurred on 3/4/2025 at approximately 10-40 crosscut on the haulage. The fall was approximately 20'long by 12' wide, 6 'high. 10-40 cross cut was dangered off on both sides and will be cleaned up.
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 5.5 on-site hours reported
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 6.0 on-site hours reported
Power wires and cables; insulation and protection.
MARSHALL COUNTY MINE · 460143730 CFR 75.517 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(c)(3) · $151.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $245.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
MARSHALL COUNTY MINE · 46014375.5 on-site hours reported
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $177.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $245.00 proposed penalty
Electric equipment; examination, testing and maintenance.
MARSHALL COUNTY MINE · 460143730 CFR 75.512 · $151.00 proposed penalty
Cable fittings; suitability.
MARSHALL COUNTY MINE · 460143730 CFR 75.515 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
MARSHALL COUNTY MINE · 460143730 CFR 75.503 · $465.00 proposed penalty
Electrical Technical Investigation
MARSHALL COUNTY MINE · 460143713.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
MARSHALL COUNTY MINE · 460143730 CFR 75.1731(a) · $245.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 5.5 on-site hours reported
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(d) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
MARSHALL COUNTY MINE · 460143730 CFR 75.1909(a)(4) · $151.00 proposed penalty
Fall of roof or back
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was rib pinning when rock struck the top of EE's head. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Handtools (nonpowered)
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was jacking a dolly when the jack bar hit the side of EE's knee. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was hooking up wench hook to lift of block when EE's finger was pinched between hook and block. PPE was not a factor, mining system was not a factor, compliance with rules and regulations was not a factor.
Slip or fall of person
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was carrying a roller on the track entry when EE stepped on the ball of the rail and sprained EE's ankle. PPE was not a factor, mining system was not a factor, compliance with rules and regulations was not a factor.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.