Marshall County Coal Resources, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Condition and examination of firefighting equipment.
MARSHALL COUNTY MINE · 460143730 CFR 75.1100-3 · $151.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Permissible electric face equipment; maintenance.
MARSHALL COUNTY MINE · 460143730 CFR 75.503 · $193.00 proposed penalty
Violation — cited standard not reported
MARSHALL COUNTY MINE · 4601437$517.00 proposed penalty
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $226.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was helping work on belt pulley when EE said EE was carrying chain fall and felt pain in EE's right chest muscle. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 5.3 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
MARSHALL COUNTY MINE · 46014375.0 on-site hours reported
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $177.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(d) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
MARSHALL COUNTY MINE · 460143730 CFR 75.370(a)(1) · $697.00 proposed penalty
Escapeways; bituminous and lignite mines.
MARSHALL COUNTY MINE · 460143730 CFR 75.380(d)(5) · $313.00 proposed penalty
Roof bolting.
MARSHALL COUNTY MINE · 460143730 CFR 75.204(f)(7) · $313.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $226.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
MARSHALL COUNTY MINE · 46014373.0 on-site hours reported
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 5.0 on-site hours reported
Electrical Technical Investigation
MARSHALL COUNTY MINE · 46014370.0 on-site hours reported
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(d)(3) · $151.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $177.00 proposed penalty
Machinery and equipment; operation and maintenance.
MARSHALL COUNTY MINE · 460143730 CFR 75.1725(a) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
MARSHALL COUNTY MINE · 460143730 CFR 75.202(a) · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
MARSHALL COUNTY MINE · 460143730 CFR 75.370(a)(1) · Significant and substantial (S&S) · $7,676.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.