Marshall County Coal Resources, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was changing rollers during outage when they took roller out of frame, the roller dropped and struck their hand. Palm of hand was between roller and frame. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Non-Injury Accident Investigation
MARSHALL COUNTY MINE · 46014374.5 on-site hours reported
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 5.0 on-site hours reported
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $226.00 proposed penalty
Minimum requirements; fire suppression materials and location; maintenance of entries and crosscuts; access doors; communications; fire crews; high-expansion foam devices.
MARSHALL COUNTY MINE · 460143730 CFR 75.1103-9(a)(2) · $151.00 proposed penalty
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $226.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $465.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(b) · $151.00 proposed penalty
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was loading a roof bolter with supplies when EE felt pop in EE's knee. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Handtools (nonpowered)
MARSHALL COUNTY MINE · 4601437No dys awy frm wrk,no rstr act
Accident narrative
Employee was cutting bands on roof straps with knife when the knife slipped and cut EE's upper leg. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor. Body positioning was a factor.
Fall of roof or back
MARSHALL COUNTY MINE · 4601437Accident only
Accident narrative
An unplanned roof fall occurred on 2/16/26 at 8:10 pm. The fall measured 16'wide, 60' long and 4' high. The fall happened on the belt line at 3-36 xc and was dangered off and will be cleaned up.
Slip or fall of person
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was walking and stepped in hole and twisted ankle. PPE was not a factor, mining systems was not a not a factor, compliance with rules and regulations was not a factor.
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was center bolting, while retrieving steels, a steel let loose and struck EE's wrist. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 7.0 on-site hours reported
Verbal Hazard Complaint Inspections
MARSHALL COUNTY MINE · 46014376.0 on-site hours reported
Roof control plan.
MARSHALL COUNTY MINE · 460143730 CFR 75.220(a)(1) · $4,749.00 proposed penalty
Actions for excessive methane.
MARSHALL COUNTY MINE · 460143730 CFR 75.323(b)(2)(i) · Significant and substantial (S&S) · $64,882.00 proposed penalty
Mine ventilation plan; submission and approval.
MARSHALL COUNTY MINE · 460143730 CFR 75.370(a)(1) · $17,082.00 proposed penalty
Deenergization of self-propelled electric face equipment installation requirements.
MARSHALL COUNTY MINE · 460143730 CFR 75.523-1(a) · Significant and substantial (S&S) · $697.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $398.00 proposed penalty
Identification of circuit breakers.
MARSHALL COUNTY MINE · 460143730 CFR 75.904 · $151.00 proposed penalty
Slip or fall of person
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was pass through man door when they slipped on a rock and fell, landing on right knee. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Identification of circuit breakers.
MARSHALL COUNTY MINE · 460143730 CFR 75.904 · $151.00 proposed penalty
Short circuit protection of trailing cables.
MARSHALL COUNTY MINE · 460143730 CFR 75.601 · $151.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $398.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.