Marshall County Coal Resources, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(b) · $151.00 proposed penalty
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was helping work on scoop battery when battery lid came down and hit EE's elbow/bicep. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Powered haulage
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
IE was a passenger in a mantrip that was travelling into a track spur. The mantrip struck a dolly that was unseen by the driver, and IE's back struck EE's seat hard. Employee continued to work without restriction until seeking medical attention on 4/24/2026, and began missing days after that. Injury was not the result of a training or compliance issue.
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was loading waterline onto scoop for belt move. When one of the water lines pipes slid off the scoop and struck EE's foot. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Machinery
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was drilled hole for rib pin and turned around to grab strap when piece of rib hit EE's back and shoulder. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
103 (g) Written Notification Hazard Complaint Inspectio
MARSHALL COUNTY MINE · 46014377.0 on-site hours reported
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $209.00 proposed penalty
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was cleaning on LW face when another employee was attempting to pass EE, that employee slipped and fell and the miner that was cleaning tried to catch EE and injured EE's back. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 9.5 on-site hours reported
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · Significant and substantial (S&S) · $818.00 proposed penalty
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · $165.00 proposed penalty
Escapeways; bituminous and lignite mines.
MARSHALL COUNTY MINE · 460143730 CFR 75.380(d)(1) · Significant and substantial (S&S) · $755.00 proposed penalty
Criteria—Belt conveyors.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-5(g) · $165.00 proposed penalty
Mechanical equipment guards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1722(a) · $209.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Installation of water sprinkler systems; requirements.
MARSHALL COUNTY MINE · 460143730 CFR 75.1101-7(c) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MARSHALL COUNTY MINE · 460143730 CFR 75.1731(b) · $165.00 proposed penalty
Machinery and equipment; operation and maintenance.
MARSHALL COUNTY MINE · 460143730 CFR 75.1725(a) · $151.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(d)(1) · $313.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $209.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(d)(1) · $151.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.