Marshall County Coal Resources, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Criteria—Belt conveyors.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-5(g) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · $177.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(e) · $151.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(d) · $336.00 proposed penalty
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $504.00 proposed penalty
Machinery and equipment; operation and maintenance.
MARSHALL COUNTY MINE · 460143730 CFR 77.404(a) · $151.00 proposed penalty
Inspection and cover plates.
MARSHALL COUNTY MINE · 460143730 CFR 77.512 · $313.00 proposed penalty
Air quality.
MARSHALL COUNTY MINE · 460143730 CFR 75.321(a)(1) · $151.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(d) · $151.00 proposed penalty
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $504.00 proposed penalty
Stationary grinding machines; protective devices.
MARSHALL COUNTY MINE · 460143730 CFR 75.1723(a)(2) · $151.00 proposed penalty
Condition and examination of firefighting equipment.
MARSHALL COUNTY MINE · 460143730 CFR 75.1100-3 · $151.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $465.00 proposed penalty
Criteria—Belt conveyors.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-5(g) · $366.00 proposed penalty
Weekly examination.
MARSHALL COUNTY MINE · 460143730 CFR 75.364(b)(4) · $151.00 proposed penalty
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was placing tubes over the bologna skin when EE felt pain in lower back. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Criteria—Haulage; general.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-10(e) · $313.00 proposed penalty
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 8.0 on-site hours reported
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · Significant and substantial (S&S) · $883.00 proposed penalty
Mine ventilation plan; submission and approval.
MARSHALL COUNTY MINE · 460143730 CFR 75.370(a)(1) · $697.00 proposed penalty
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $504.00 proposed penalty
Machinery and equipment; operation and maintenance.
MARSHALL COUNTY MINE · 460143730 CFR 75.1725(a) · $151.00 proposed penalty
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · $398.00 proposed penalty
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.