Marion County Coal Resources, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
Marion County Mine · 4601433103(i) · 5.8 on-site hours reported
Non-Injury Accident Investigation
Marion County Mine · 46014337.0 on-site hours reported
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · $697.00 proposed penalty
Ventilation controls.
Marion County Mine · 460143330 CFR 75.333(h) · $366.00 proposed penalty
Conventional roof support.
Marion County Mine · 460143330 CFR 75.206(e) · $151.00 proposed penalty
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Travelways at surface installations.
Marion County Mine · 460143330 CFR 77.205(a) · $151.00 proposed penalty
Fall of roof or back
Marion County Mine · 4601433Accident only
Accident narrative
Unplanned roof fall discovered reportable on 1 North Haulage at 14 block at approximately 5:37 am. Fall primarily occurred in an adjacent crosscut and came out into the track haulage entry, continuing inby. Fall was approximately 25' long, 16' wide and 5' high. No problems with equipment or compliance issues, training or PPE.
Verbal Hazard Complaint Inspections
Marion County Mine · 46014333.3 on-site hours reported
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · $313.00 proposed penalty
Protection from falls of roof, face and ribs.
Marion County Mine · 460143330 CFR 75.202(a) · $288.00 proposed penalty
Protection from falls of roof, face and ribs.
Marion County Mine · 460143330 CFR 75.202(a) · $288.00 proposed penalty
Weekly examination.
Marion County Mine · 460143330 CFR 75.364(b)(2) · $151.00 proposed penalty
Non-Injury Accident Investigation
Marion County Mine · 46014334.0 on-site hours reported
Non-Injury Accident Investigation
Marion County Mine · 46014334.0 on-site hours reported
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · $288.00 proposed penalty
Ventilation controls.
Marion County Mine · 460143330 CFR 75.333(d)(3) · $151.00 proposed penalty
Ventilation controls.
Marion County Mine · 460143330 CFR 75.333(h) · $165.00 proposed penalty
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · $642.00 proposed penalty
Roof control plan.
Marion County Mine · 460143330 CFR 75.220(a)(1) · $313.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
Marion County Mine · 460143330 CFR 75.363(a) · $1,037.00 proposed penalty
Protection from falls of roof, face and ribs.
Marion County Mine · 460143330 CFR 75.202(a) · $642.00 proposed penalty
Protection from falls of roof, face and ribs.
Marion County Mine · 460143330 CFR 75.202(a) · $2,133.00 proposed penalty
Spot Inspections
Marion County Mine · 4601433103(i) · 9.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.