Marion County Coal Resources, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of incombustible content of rock dust.
Marion County Mine · 460143330 CFR 75.403 · $465.00 proposed penalty
Handling of materials
Marion County Mine · 4601433Days away from work only
Accident narrative
Injured was helping 2 other miners re-rail a 555 scoop at the 230 foot mark of the slope track. Two airbags were placed to lift the scoop, blocking was being installed to support the scoop to deflate the bags when a crib block shot out from underneath an airbag and struck the injured employees hard hat, resulting in a small contusion to EEs forehead and a sprain/strain to EEs neck.
Non-Fatal Accident Investigation
Marion County Mine · 460143313.0 on-site hours reported
Violation — cited standard not reported
Marion County Mine · 4601433Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · $549.00 proposed penalty
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · $245.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
Marion County Mine · 460143330 CFR 75.363(a) · $818.00 proposed penalty
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · $1,431.00 proposed penalty
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · $193.00 proposed penalty
Escapeways; bituminous and lignite mines.
Marion County Mine · 460143330 CFR 75.380(d)(1) · $245.00 proposed penalty
Spot Inspections
Marion County Mine · 4601433103(i) · 7.3 on-site hours reported
Power wires and cables; insulation and protection.
Marion County Mine · 460143330 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · $245.00 proposed penalty
Mine map.
Marion County Mine · 460143330 CFR 75.1200(c) · $151.00 proposed penalty
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
Marion County Mine · 460143330 CFR 75.370(a)(1) · $549.00 proposed penalty
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · $432.00 proposed penalty
Spot Inspections
Marion County Mine · 4601433103(i) · 8.0 on-site hours reported
Handling of materials
Marion County Mine · 4601433Days away from work only
Accident narrative
Employee was exiting a mantrip when EE's right foot was stuck under the seat. When attempting to pull it free EE injured EE's right knee.
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · $226.00 proposed penalty
Spot Inspections
Marion County Mine · 4601433103(i) · 5.8 on-site hours reported
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · $193.00 proposed penalty
Verbal Hazard Complaint Inspections
Marion County Mine · 46014332.5 on-site hours reported
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · Significant and substantial (S&S) · $959.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.