← MARFORK COAL COMPANY, LLC

MARFORK COAL COMPANY, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Escapeways; bituminous and lignite mines.

    violationRecord 5092982
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.380(d)(7)(vii)(A) · $642.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5092981
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.400 · $151.00 proposed penalty

  3. Regular Safety and Health Inspection

    inspectionRecord F00ACA4
    PANTHER EAGLE MINE · 4609212

    422.3 on-site hours reported

  4. Regular Safety and Health Inspection

    inspectionRecord F02B62F
    Glen Alum Tunnel Mine · 4609375

    208.5 on-site hours reported

  5. Regular Safety and Health Inspection

    inspectionRecord 6322447
    BLACK EAGLE · 4609550

    346.3 on-site hours reported

  6. Roof control plan.

    violationRecord 5092980
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.220(a)(1) · $818.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5092979
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  8. Verbal Hazard Complaint Inspections

    inspectionRecord F0150B8
    BLACK EAGLE · 4609550

    4.0 on-site hours reported

  9. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5180037
    Marfork Processing · 4608374

    30 CFR 77.1606(c) · $151.00 proposed penalty

  10. Loading and haulage equipment; installations.

    violationRecord 5180036
    Marfork Processing · 4608374

    30 CFR 77.1605(d) · $151.00 proposed penalty

  11. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5180035
    Marfork Processing · 4608374

    30 CFR 77.1606(c) · $151.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5092710
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  13. Ventilation controls.

    violationRecord 5020766
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.333(c) · $288.00 proposed penalty

  14. Verbal Hazard Complaint Inspections

    inspectionRecord 6322598
    Marfork Processing · 4608374

    3.0 on-site hours reported

  15. Spot Inspections

    inspectionRecord F00C0B8
    BLACK EAGLE · 4609550

    103(i) · 7.0 on-site hours reported

  16. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5180034
    Marfork Processing · 4608374

    30 CFR 77.1606(c) · $151.00 proposed penalty

  17. Accumulations of combustible materials.

    violationRecord 5180033
    Marfork Processing · 4608374

    30 CFR 77.1104 · $151.00 proposed penalty

  18. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5180032
    Marfork Processing · 4608374

    30 CFR 77.1606(c) · $151.00 proposed penalty

  19. Power wires and cables; insulation and protection.

    violationRecord 5020765
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty

  20. Roof control plan.

    violationRecord 9847602
    BLACK EAGLE · 4609550

    30 CFR 75.220(a)(1) · $755.00 proposed penalty

  21. Power wires and cables; insulation and protection.

    violationRecord 5024908
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.517 · $549.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5024907
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.400 · $209.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5020764
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.202(a) · $549.00 proposed penalty

  24. Quarterly sampling; mechanized mining units.

    violationRecord 5027629
    PANTHER EAGLE MINE · 4609212

    30 CFR 70.208(a)(2) · $288.00 proposed penalty

  25. Cited standard: 30 CFR 70.207(a)

    violationRecord 5027628
    PANTHER EAGLE MINE · 4609212

    30 CFR 70.207(a) · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.