← MARFORK COAL COMPANY, LLC

MARFORK COAL COMPANY, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Storage of materials.

    violationRecord 9847813
    Marfork Processing · 4608374

    30 CFR 77.208(d) · $151.00 proposed penalty

  2. Travelways at surface installations.

    violationRecord 9847812
    Marfork Processing · 4608374

    30 CFR 77.205(a) · $267.00 proposed penalty

  3. Electric equipment; examination, testing and maintenance.

    violationRecord 9848385
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.512 · $549.00 proposed penalty

  4. Roof control plan.

    violationRecord 9848384
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 9849878
    BLACK EAGLE · 4609550

    30 CFR 75.400 · $755.00 proposed penalty

  6. Spot Inspections

    inspectionRecord 6321432
    BLACK EAGLE · 4609550

    103(i) · 5.0 on-site hours reported

  7. Travelways at surface installations.

    violationRecord 9847811
    Marfork Processing · 4608374

    30 CFR 77.205(a) · $151.00 proposed penalty

  8. Loading and haulage equipment; installations.

    violationRecord 9847810
    Marfork Processing · 4608374

    30 CFR 77.1605(k) · $151.00 proposed penalty

  9. Accumulations of combustible materials.

    violationRecord 9847809
    Marfork Processing · 4608374

    30 CFR 77.1104 · $151.00 proposed penalty

  10. Mining methods.

    violationRecord 9849877
    BLACK EAGLE · 4609550

    30 CFR 75.203(b) · $883.00 proposed penalty

  11. Mine ventilation plan; submission and approval.

    violationRecord 9848617
    BLACK EAGLE · 4609550

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  12. Cited standard: 30 CFR 70.206(h)(2)

    violationRecord 9848616
    BLACK EAGLE · 4609550

    30 CFR 70.206(h)(2) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  13. Respirable dust standards.

    violationRecord 9848615
    BLACK EAGLE · 4609550

    30 CFR 70.100(a)(2) · Significant and substantial (S&S) · $959.00 proposed penalty

  14. Ventilation controls.

    violationRecord 5024245
    BLACK EAGLE · 4609550

    30 CFR 75.333(e)(1)(ii) · $398.00 proposed penalty

  15. Accumulations of combustible materials.

    violationRecord 9847808
    Marfork Processing · 4608374

    30 CFR 77.1104 · $151.00 proposed penalty

  16. Mobile equipment; automatic warning devices.

    violationRecord 9847807
    Marfork Processing · 4608374

    30 CFR 77.410(a)(1) · $151.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 9849876
    BLACK EAGLE · 4609550

    30 CFR 75.202(a) · $7,676.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 9849875
    BLACK EAGLE · 4609550

    30 CFR 75.400 · $1,679.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 5024244
    BLACK EAGLE · 4609550

    30 CFR 75.202(a) · $697.00 proposed penalty

  20. Protection from falls of roof, face and ribs.

    violationRecord 5024243
    BLACK EAGLE · 4609550

    30 CFR 75.202(a) · $697.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5024831
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.400 · $245.00 proposed penalty

  22. Mechanical equipment guards.

    violationRecord 9847806
    Marfork Processing · 4608374

    30 CFR 77.400(a) · $151.00 proposed penalty

  23. Trailing cables or portable cables; temporary splices.

    violationRecord 9847805
    Marfork Processing · 4608374

    30 CFR 77.601 · $267.00 proposed penalty

  24. Temporary, portable containers.

    violationRecord 9847804
    Marfork Processing · 4608374

    30 CFR 47.44(b) · $151.00 proposed penalty

  25. Travelways at surface installations.

    violationRecord 9847803
    Marfork Processing · 4608374

    30 CFR 77.205(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.