← MARFORK COAL COMPANY, LLC

MARFORK COAL COMPANY, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Loading and haulage equipment; installations.

    violationRecord 5024496
    Marfork Processing · 4608374

    30 CFR 77.1605(a) · $151.00 proposed penalty

  2. Quarterly sampling; designated work positions.

    violationRecord 5024495
    Marfork Processing · 4608374

    30 CFR 71.206(c)(2) · $151.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5020665
    BLACK EAGLE · 4609550

    30 CFR 75.400 · $642.00 proposed penalty

  4. Machinery

    accidentRecord 220252480025
    BLACK EAGLE · 4609550

    No dys awy frm wrk,no rstr act

    Accident narrative

    While installing a cable bolt, the roof bolt plate came in contact with their forearm causing a laceration that required 4 staples

  5. Accumulation of combustible materials.

    violationRecord 5026087
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $504.00 proposed penalty

  6. Electric equipment; examination, testing and maintenance.

    violationRecord 5026086
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.512 · $313.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 5026085
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.512 · $1,037.00 proposed penalty

  8. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5026084
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.1731(a) · $288.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 5026083
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.202(a) · $549.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5021616
    BLACK EAGLE · 4609550

    30 CFR 75.202(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  11. Other safeguards.

    violationRecord 5021615
    BLACK EAGLE · 4609550

    30 CFR 75.1403 · $25,484.00 proposed penalty

  12. Escapeways; bituminous and lignite mines.

    violationRecord 5020664
    BLACK EAGLE · 4609550

    30 CFR 75.380(d)(7)(vi) · $465.00 proposed penalty

  13. Hoisting

    accidentRecord 220252450015
    Marfork Processing · 4608374

    Fatality

    Accident narrative

    Employee received crushing fatal injuries while assisting MSHA inspection of elevator inside of Preparation Plant.

  14. Fatal Accident Investigation

    inspectionRecord F009586
    Marfork Processing · 4608374

    214.8 on-site hours reported

  15. Violation — cited standard not reported

    violationRecord 5022025
    Marfork Processing · 4608374
  16. Accumulation of combustible materials.

    violationRecord 5026082
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $504.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 5026081
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.512 · $465.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5026080
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $504.00 proposed penalty

  19. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5020663
    BLACK EAGLE · 4609550

    30 CFR 75.1107-9(a)(1) · $151.00 proposed penalty

  20. Spot Inspections

    inspectionRecord 6322030
    BLACK EAGLE · 4609550

    103(i) · 8.0 on-site hours reported

  21. Requirement for container labels.

    violationRecord 5024494
    Marfork Processing · 4608374

    30 CFR 47.41(a) · $151.00 proposed penalty

  22. Mechanical equipment guards.

    violationRecord 5024493
    Marfork Processing · 4608374

    30 CFR 77.400(c) · $151.00 proposed penalty

  23. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020662
    BLACK EAGLE · 4609550

    30 CFR 75.1731(b) · $336.00 proposed penalty

  24. Loading and haulage equipment; operation.

    violationRecord 5024492
    Marfork Processing · 4608374

    30 CFR 77.1607(n) · $151.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5026079
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $504.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.