MARFORK COAL COMPANY, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Impoundment Spot Inspection
Marfork Processing · 46083744.0 on-site hours reported
Protection from falls of roof, face and ribs.
BLACK EAGLE · 460955030 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Frequency of examinations.
BLACK EAGLE · 460955030 CFR 75.512-2 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BLACK EAGLE · 460955030 CFR 75.512 · $1,431.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BLACK EAGLE · 460955030 CFR 75.512 · $504.00 proposed penalty
Emergency tethers.
BLACK EAGLE · 460955030 CFR 75.1714-6 · $226.00 proposed penalty
Verbal Hazard Complaint Inspections
BLACK EAGLE · 46095504.5 on-site hours reported
Verbal Hazard Complaint Inspections
BLACK EAGLE · 460955013.0 on-site hours reported
Verbal Hazard Complaint Inspections
BLACK EAGLE · 460955013.5 on-site hours reported
Maintenance of incombustible content of rock dust.
PANTHER EAGLE MINE · 460921230 CFR 75.403 · $1,126.00 proposed penalty
Maintenance of incombustible content of rock dust.
PANTHER EAGLE MINE · 460921230 CFR 75.403 · $1,126.00 proposed penalty
Mine ventilation plan; submission and approval.
BLACK EAGLE · 460955030 CFR 75.370(a)(1) · $818.00 proposed penalty
Health Technical Investigation
Marfork Processing · 460837413.3 on-site hours reported
Maintenance of incombustible content of rock dust.
Glen Alum Tunnel Mine · 460937530 CFR 75.403 · $245.00 proposed penalty
Roof control plan.
BLACK EAGLE · 460955030 CFR 75.220(a)(1) · $697.00 proposed penalty
Spot Inspections
BLACK EAGLE · 4609550103(i) · 8.0 on-site hours reported
Mine ventilation plan; submission and approval.
BLACK EAGLE · 460955030 CFR 75.370(a)(1) · $504.00 proposed penalty
Mine ventilation plan; submission and approval.
BLACK EAGLE · 460955030 CFR 75.370(a)(1) · $755.00 proposed penalty
Maintenance of incombustible content of rock dust.
Glen Alum Tunnel Mine · 460937530 CFR 75.403 · $245.00 proposed penalty
Ventilation controls.
PANTHER EAGLE MINE · 460921230 CFR 75.333(c)(2) · $288.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
Glen Alum Tunnel Mine · 460937530 CFR 75.1714-3(a) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
PANTHER EAGLE MINE · 460921230 CFR 75.1731(b) · $288.00 proposed penalty
Roof control plan.
PANTHER EAGLE MINE · 460921230 CFR 75.220(a)(1) · $398.00 proposed penalty
Loading and haulage equipment; installations.
PANTHER EAGLE MINE · 460921230 CFR 77.1605(d) · $151.00 proposed penalty
Roof control plan.
Glen Alum Tunnel Mine · 460937530 CFR 75.220(a)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.