← MARFORK COAL COMPANY, LLC

MARFORK COAL COMPANY, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Impoundment Spot Inspection

    inspectionRecord F028706
    Marfork Processing · 4608374

    4.0 on-site hours reported

  2. Protection from falls of roof, face and ribs.

    violationRecord 5026189
    BLACK EAGLE · 4609550

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  3. Frequency of examinations.

    violationRecord 5020717
    BLACK EAGLE · 4609550

    30 CFR 75.512-2 · $151.00 proposed penalty

  4. Electric equipment; examination, testing and maintenance.

    violationRecord 5020716
    BLACK EAGLE · 4609550

    30 CFR 75.512 · $1,431.00 proposed penalty

  5. Electric equipment; examination, testing and maintenance.

    violationRecord 5026188
    BLACK EAGLE · 4609550

    30 CFR 75.512 · $504.00 proposed penalty

  6. Emergency tethers.

    violationRecord 5026187
    BLACK EAGLE · 4609550

    30 CFR 75.1714-6 · $226.00 proposed penalty

  7. Verbal Hazard Complaint Inspections

    inspectionRecord F01FF2F
    BLACK EAGLE · 4609550

    4.5 on-site hours reported

  8. Verbal Hazard Complaint Inspections

    inspectionRecord F0081C1
    BLACK EAGLE · 4609550

    13.0 on-site hours reported

  9. Verbal Hazard Complaint Inspections

    inspectionRecord 6322437
    BLACK EAGLE · 4609550

    13.5 on-site hours reported

  10. Maintenance of incombustible content of rock dust.

    violationRecord 5027822
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.403 · $1,126.00 proposed penalty

  11. Maintenance of incombustible content of rock dust.

    violationRecord 5027821
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.403 · $1,126.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5028541
    BLACK EAGLE · 4609550

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  13. Health Technical Investigation

    inspectionRecord F00958C
    Marfork Processing · 4608374

    13.3 on-site hours reported

  14. Maintenance of incombustible content of rock dust.

    violationRecord 5020120
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.403 · $245.00 proposed penalty

  15. Roof control plan.

    violationRecord 5020715
    BLACK EAGLE · 4609550

    30 CFR 75.220(a)(1) · $697.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F00958B
    BLACK EAGLE · 4609550

    103(i) · 8.0 on-site hours reported

  17. Mine ventilation plan; submission and approval.

    violationRecord 5022047
    BLACK EAGLE · 4609550

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5020714
    BLACK EAGLE · 4609550

    30 CFR 75.370(a)(1) · $755.00 proposed penalty

  19. Maintenance of incombustible content of rock dust.

    violationRecord 5020118
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.403 · $245.00 proposed penalty

  20. Ventilation controls.

    violationRecord 5027817
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.333(c)(2) · $288.00 proposed penalty

  21. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5022046
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.1714-3(a) · $245.00 proposed penalty

  22. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5027816
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.1731(b) · $288.00 proposed penalty

  23. Roof control plan.

    violationRecord 5027815
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.220(a)(1) · $398.00 proposed penalty

  24. Loading and haulage equipment; installations.

    violationRecord 5025208
    PANTHER EAGLE MINE · 4609212

    30 CFR 77.1605(d) · $151.00 proposed penalty

  25. Roof control plan.

    violationRecord 5020117
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.