← MARFORK COAL COMPANY, LLC

MARFORK COAL COMPANY, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5024892
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.400 · $177.00 proposed penalty

  2. On-shift examination.

    violationRecord 5024891
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.362(d)(3)(v) · $151.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5092698
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  4. Mine ventilation plan; submission and approval.

    violationRecord 5092697
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  5. Protection of trailing cables.

    violationRecord 5092696
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.606 · $151.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5020747
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5020746
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $366.00 proposed penalty

  8. Methane monitors.

    violationRecord 5020745
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  9. Maintenance of incombustible content of rock dust.

    violationRecord 5020305
    BLACK EAGLE · 4609550

    30 CFR 75.403 · $151.00 proposed penalty

  10. Maintenance of incombustible content of rock dust.

    violationRecord 5020304
    BLACK EAGLE · 4609550

    30 CFR 75.403 · $151.00 proposed penalty

  11. Ventilation controls.

    violationRecord 5020132
    BLACK EAGLE · 4609550

    30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty

  12. Impoundment Spot Inspection

    inspectionRecord F028711
    Marfork Processing · 4608374

    4.3 on-site hours reported

  13. Immediate notification.

    violationRecord 9554303
    PANTHER EAGLE MINE · 4609212

    30 CFR 50.10(b) · $7,555.00 proposed penalty

  14. Roof control plan.

    violationRecord 9554302
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  15. Electric equipment; examination, testing and maintenance.

    violationRecord 5092695
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.512 · $288.00 proposed penalty

  16. Roof control plan.

    violationRecord 5092694
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5020744
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5020743
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $366.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F00C0AD
    BLACK EAGLE · 4609550

    103(i) · 6.0 on-site hours reported

  20. Violation — cited standard not reported

    violationRecord 5029784
    PANTHER EAGLE MINE · 4609212

    $215.00 proposed penalty

  21. Methane monitors.

    violationRecord 9847591
    BLACK EAGLE · 4609550

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  22. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5020742
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.1107-9(a)(1) · $193.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5020741
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5020740
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  25. Power wires and cables; insulation and protection.

    violationRecord 5020739
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.517 · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.