← MARFORK COAL COMPANY, LLC

MARFORK COAL COMPANY, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Condition and examination of firefighting equipment.

    violationRecord 5097973
    BLACK EAGLE · 4609550

    30 CFR 75.1100-3 · $151.00 proposed penalty

  2. Cable fittings; suitability.

    violationRecord 5097972
    BLACK EAGLE · 4609550

    30 CFR 75.515 · $398.00 proposed penalty

  3. Installation of main mine fans.

    violationRecord 5020759
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.310(a)(4) · $151.00 proposed penalty

  4. Impoundment Spot Inspection

    inspectionRecord F028715
    Marfork Processing · 4608374

    4.3 on-site hours reported

  5. Accumulation of combustible materials.

    violationRecord 5092706
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $366.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 5092705
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.202(a) · Significant and substantial (S&S) · $818.00 proposed penalty

  7. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020758
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.1731(b) · $151.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5020757
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  9. Spot Inspections

    inspectionRecord F00C0B0
    BLACK EAGLE · 4609550

    103(i) · 6.5 on-site hours reported

  10. Automatic fire sensor and warning device systems; installation; minimum requirements.

    violationRecord 5092704
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.1103-4(a)(1)(i) · $151.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5092703
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5092702
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $366.00 proposed penalty

  13. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020756
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.1731(a) · $193.00 proposed penalty

  14. Ventilation controls.

    violationRecord 5020755
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty

  15. Roof control plan.

    violationRecord 5020754
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 9847598
    BLACK EAGLE · 4609550

    30 CFR 75.202(a) · $366.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 5020307
    BLACK EAGLE · 4609550

    30 CFR 75.512 · $193.00 proposed penalty

  18. Escapeways; bituminous and lignite mines.

    violationRecord 5020306
    BLACK EAGLE · 4609550

    30 CFR 75.380(d)(7)(vii)(A) · $151.00 proposed penalty

  19. Communications.

    violationRecord 5092701
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.1600 · $151.00 proposed penalty

  20. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5097971
    BLACK EAGLE · 4609550

    30 CFR 75.1107-9(a)(2) · $267.00 proposed penalty

  21. Machinery and equipment; operation and maintenance.

    violationRecord 5097970
    BLACK EAGLE · 4609550

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  22. Quantity and location of firefighting equipment.

    violationRecord 5097969
    BLACK EAGLE · 4609550

    30 CFR 75.1100-2(d) · $267.00 proposed penalty

  23. Additional self-contained self-rescuers (SCSRs).

    violationRecord 5097968
    BLACK EAGLE · 4609550

    30 CFR 75.1714-4(e) · $288.00 proposed penalty

  24. Verbal Hazard Complaint Inspections

    inspectionRecord F00190C
    Marfork Processing · 4608374

    9.8 on-site hours reported

  25. Verbal Hazard Complaint Inspections

    inspectionRecord 6323043
    BLACK EAGLE · 4609550

    5.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.