Fire suppression systems for diesel-powered equipment and fuel transportation units.
Mach #1 Mine · 110314130 CFR 75.1911(i) · $151.00 proposed penalty
Weekly examination.
Mach #1 Mine · 110314130 CFR 75.364(b)(8)(ii) · $697.00 proposed penalty
Mine ventilation plan; submission and approval.
Mach #1 Mine · 110314130 CFR 75.370(a)(1) · $1,037.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $398.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $366.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mach #1 Mine · 110314130 CFR 75.512 · $226.00 proposed penalty
Maintenance of diesel-powered equipment.
Mach #1 Mine · 110314130 CFR 75.1914(f) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Mach #1 Mine · 110314130 CFR 75.1909(b)(4) · $193.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Mach #1 Mine · 110314130 CFR 75.1909(a)(3)(x) · $288.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
Mach #1 Mine · 110314130 CFR 75.1910(f) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Mach #1 Mine · 110314130 CFR 75.1909(a)(2) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
Mach #1 Mine · 110314130 CFR 75.1911(i) · $193.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 5.3 on-site hours reported
Mine ventilation plan; submission and approval.
Mach #1 Mine · 110314130 CFR 75.370(a)(1) · $1,037.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $366.00 proposed penalty
Non-Injury Accident Investigation
Mach #1 Mine · 110314111.5 on-site hours reported
Violation — cited standard not reported
Mach #1 Mine · 1103141Ventilation controls.
Mach #1 Mine · 110314130 CFR 75.333(h) · $209.00 proposed penalty
Machinery and equipment; operation and maintenance.
Mach #1 Mine · 110314130 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · Significant and substantial (S&S) · $6,540.00 proposed penalty
Fall of roof or back
Mach #1 Mine · 1103141Accident only
Accident narrative
A roof fall occurred on the set-up face on HG 18 between xc 3 and xc 4 in the # 1 entry.
Spot Inspections
Mach #1 Mine · 1103141103(i) · 3.0 on-site hours reported
Regular Safety and Health Inspection
Mach #1 Mine · 1103141539.5 on-site hours reported
Non-Injury Accident Investigation
Mach #1 Mine · 11031419.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.