M-Class Mining LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Roof control plan.
MC#1 Mine · 110318930 CFR 75.220(a)(1) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $2,312.00 proposed penalty
Mechanical equipment guards.
MC#1 Mine · 110318930 CFR 75.1722(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $398.00 proposed penalty
Handtools (nonpowered)
MC#1 Mine · 1103189No dys awy frm wrk,no rstr act
Accident narrative
The IE was removing a 10-inch valve in the RO Plant and had removed several bolts. When the IE removed the 2nd to last bolt, the valve swiveled and pinched the IE's ring finger between the collar of the valve and the pipe
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.0 on-site hours reported
Inspection of fire suppression devices.
MC#1 Mine · 110318930 CFR 75.1107-16-b · $245.00 proposed penalty
Weekly examination.
MC#1 Mine · 110318930 CFR 75.364(b) · $151.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.0 on-site hours reported
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · $165.00 proposed penalty
Travelways at surface installations.
MC#1 Mine · 110318930 CFR 77.205(e) · $245.00 proposed penalty
Travelways at surface installations.
MC#1 Mine · 110318930 CFR 77.205(b) · $245.00 proposed penalty
Accumulations of combustible materials.
MC#1 Mine · 110318930 CFR 77.1104 · $245.00 proposed penalty
Maintenance of incombustible content of rock dust.
MC#1 Mine · 110318930 CFR 75.403 · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $432.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(h) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.0 on-site hours reported
Grounding metallic frames, casings, and other enclosures of electric equipment.
MC#1 Mine · 110318930 CFR 75.701 · $245.00 proposed penalty
Permissible electric face equipment; maintenance.
MC#1 Mine · 110318930 CFR 75.503 · $313.00 proposed penalty
Low- and medium-voltage circuits serving three-phase alternating current equipment; circuit breakers.
MC#1 Mine · 110318930 CFR 75.900 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(h) · $288.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 5.5 on-site hours reported
Protection from falls of roof, face and ribs.
MC#1 Mine · 110318930 CFR 75.202(a) · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.