Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $818.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 5.8 on-site hours reported
Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(h) · $209.00 proposed penalty
Other safeguards.
MC#1 Mine · 110318930 CFR 75.1403 · Significant and substantial (S&S) · $959.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 4.0 on-site hours reported
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · $226.00 proposed penalty
Condition and examination of firefighting equipment.
MC#1 Mine · 110318930 CFR 75.1100-3 · $165.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
MC#1 Mine · 110318930 CFR 75.1107-9(a)(2) · $165.00 proposed penalty
Permissible electric face equipment; maintenance.
MC#1 Mine · 110318930 CFR 75.503 · $193.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $245.00 proposed penalty
Mechanical escape facilities.
MC#1 Mine · 110318930 CFR 75.382(b) · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(b) · $165.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.8 on-site hours reported
Permissible electric face equipment; maintenance.
MC#1 Mine · 110318930 CFR 75.503 · $226.00 proposed penalty
Permissible electric face equipment; maintenance.
MC#1 Mine · 110318930 CFR 75.503 · Significant and substantial (S&S) · $504.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 7.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
MC#1 Mine · 110318930 CFR 75.512 · $209.00 proposed penalty
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · $151.00 proposed penalty
Conventional roof support.
MC#1 Mine · 110318930 CFR 75.206(e) · $193.00 proposed penalty
Other safeguards.
MC#1 Mine · 110318930 CFR 75.1403 · $193.00 proposed penalty
Proximity detection systems.
MC#1 Mine · 110318930 CFR 75.1732(b)(6) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Power wires and cables; insulation and protection.
MC#1 Mine · 110318930 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $366.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.