Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(c)(3) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
MC#1 Mine · 110318930 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Roof control plan.
MC#1 Mine · 110318930 CFR 75.220(a)(1) · $267.00 proposed penalty
Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(c)(3) · $959.00 proposed penalty
Self-rescue devices; use and location requirements.
MC#1 Mine · 110318930 CFR 75.1714-2(b) · Significant and substantial (S&S) · $14,557.00 proposed penalty
Transport of diesel fuel.
MC#1 Mine · 110318930 CFR 75.1906(b) · $151.00 proposed penalty
Self-rescue devices; use and location requirements.
MC#1 Mine · 110318930 CFR 75.1714-2(c) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Self-rescue devices; use and location requirements.
MC#1 Mine · 110318930 CFR 75.1714-2(c) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 7.5 on-site hours reported
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · Significant and substantial (S&S) · $592.00 proposed penalty
Electrical protection.
MC#1 Mine · 110318930 CFR 75.814(c) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Electrical protection.
MC#1 Mine · 110318930 CFR 75.814(c) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Installation of high-voltage transmission cables.
MC#1 Mine · 110318930 CFR 75.807 · $193.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $336.00 proposed penalty
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · $245.00 proposed penalty
Roof testing and scaling.
MC#1 Mine · 110318930 CFR 75.211(d) · $209.00 proposed penalty
Power wires and cables; insulation and protection.
MC#1 Mine · 110318930 CFR 75.517 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · Significant and substantial (S&S) · $592.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.8 on-site hours reported
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
MC#1 Mine · 110318930 CFR 75.380(i)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Air quality.
MC#1 Mine · 110318930 CFR 75.321(a)(2) · $193.00 proposed penalty
Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(d)(3) · $209.00 proposed penalty
Air quality.
MC#1 Mine · 110318930 CFR 75.321(a)(2) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.