← M-Class Mining LLC

M-Class Mining LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5016106
    MC#1 Mine · 1103189

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  2. Verbal Hazard Complaint Inspections

    inspectionRecord F002242
    MC#1 Mine · 1103189

    7.0 on-site hours reported

  3. Spot Inspections

    inspectionRecord 7023093
    MC#1 Mine · 1103189

    103(i) · 6.5 on-site hours reported

  4. Multi-gas detectors.

    violationRecord 5012037
    MC#1 Mine · 1103189

    30 CFR 75.1714-7(a) · $193.00 proposed penalty

  5. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9786596
    MC#1 Mine · 1103189

    30 CFR 75.1909(a)(2) · $193.00 proposed penalty

  6. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9786595
    MC#1 Mine · 1103189

    30 CFR 75.1909(d) · $193.00 proposed penalty

  7. Power wires and cables; insulation and protection.

    violationRecord 9549780
    MC#1 Mine · 1103189

    30 CFR 75.517 · $697.00 proposed penalty

  8. Spot Inspections

    inspectionRecord 7023092
    MC#1 Mine · 1103189

    103(i) · 6.5 on-site hours reported

  9. Methane monitors.

    violationRecord 9786594
    MC#1 Mine · 1103189

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5016105
    MC#1 Mine · 1103189

    30 CFR 75.202(a) · $226.00 proposed penalty

  11. Spot Inspections

    inspectionRecord 7023091
    MC#1 Mine · 1103189

    103(i) · 7.0 on-site hours reported

  12. Mine ventilation plan; submission and approval.

    violationRecord 5016104
    MC#1 Mine · 1103189

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  13. Permissible electric face equipment; maintenance.

    violationRecord 5012036
    MC#1 Mine · 1103189

    30 CFR 75.503 · $245.00 proposed penalty

  14. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9786593
    MC#1 Mine · 1103189

    30 CFR 75.1731(a) · $209.00 proposed penalty

  15. High-voltage underground equipment; grounding.

    violationRecord 9786592
    MC#1 Mine · 1103189

    30 CFR 75.811 · $642.00 proposed penalty

  16. Other safeguards.

    violationRecord 9786591
    MC#1 Mine · 1103189

    30 CFR 75.1403 · $193.00 proposed penalty

  17. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9786590
    MC#1 Mine · 1103189

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  18. Deenergization of self-propelled electric face equipment; performance requirements.

    violationRecord 5012035
    MC#1 Mine · 1103189

    30 CFR 75.523-2(c) · Significant and substantial (S&S) · $959.00 proposed penalty

  19. Escapeways; bituminous and lignite mines.

    violationRecord 5012034
    MC#1 Mine · 1103189

    30 CFR 75.380(f)(3)(iii) · $209.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5016103
    MC#1 Mine · 1103189

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  21. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9786589
    MC#1 Mine · 1103189

    30 CFR 75.1909(a)(8) · $209.00 proposed penalty

  22. Methane monitors.

    violationRecord 5012033
    MC#1 Mine · 1103189

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  23. Spot Inspections

    inspectionRecord 7023090
    MC#1 Mine · 1103189

    103(i) · 6.0 on-site hours reported

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5016102
    MC#1 Mine · 1103189

    30 CFR 75.1731(a) · $209.00 proposed penalty

  25. Machinery and equipment; operation and maintenance.

    violationRecord 5016101
    MC#1 Mine · 1103189

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.