Lyons Salt Company safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Compliance Follow-up Inspection
Lyons Mine · 14004131.3 on-site hours reported
Dust control.
Lyons Mine · 140041330 CFR 57.9315 · Significant and substantial (S&S)
Verbal Hazard Complaint Inspections
Lyons Mine · 14004133.0 on-site hours reported
Verbal Hazard Complaint Inspections
Lyons Mine · 14004135.5 on-site hours reported
Examination of working places.
Lyons Mine · 140041330 CFR 57.18002(b) · $151.00 proposed penalty
Compliance Follow-up Inspection
Lyons Mine · 14004130.0 on-site hours reported
General instructions for completing MSHA Form 7000-1.
Lyons Mine · 140041330 CFR 50.20-1 · $151.00 proposed penalty
Underground self-propelled equipment.
Lyons Mine · 140041330 CFR 57.4260(c) · $177.00 proposed penalty
Inspection.
Lyons Mine · 140041330 CFR 57.4201(a)(1) · $177.00 proposed penalty
Safety defects; examination, correction and records.
Lyons Mine · 140041330 CFR 57.14100(b) · $313.00 proposed penalty
Brakes.
Lyons Mine · 140041330 CFR 57.14101(a)(3) · $209.00 proposed penalty
Construction and maintenance of guards.
Lyons Mine · 140041330 CFR 57.14112(a)(1) · $151.00 proposed penalty
Temporary, portable containers.
Lyons Mine · 140041330 CFR 47.44(b) · $151.00 proposed penalty
General requirements.
Lyons Mine · 140041330 CFR 57.4200(b)(2) · $209.00 proposed penalty
Housekeeping.
Lyons Mine · 140041330 CFR 57.20003(a) · $209.00 proposed penalty
Housekeeping.
Lyons Mine · 140041330 CFR 57.20003(a) · $209.00 proposed penalty
Regular Safety and Health Inspection
Lyons Mine · 140041336.3 on-site hours reported
Handtools (nonpowered)
Lyons Mine · 1400413No dys awy frm wrk,no rstr act
Accident narrative
The employee was cutting a zip tie with a utility knife in right hand, after cutting through, the forward motion of their arm/hand allowed the knife to cut into their arm about three inches above their wrist. Three sutures were used on the laceration.
Construction and maintenance of guards.
Lyons Mine · 140041330 CFR 57.14112(b) · $313.00 proposed penalty
Housekeeping.
Lyons Mine · 140041330 CFR 57.20003(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Housekeeping.
Lyons Mine · 140041330 CFR 57.20003(a) · $336.00 proposed penalty
Correction of dangerous conditions.
Lyons Mine · 140041330 CFR 57.12030 · $336.00 proposed penalty
Safety defects; examination, correction and records.
Lyons Mine · 140041330 CFR 57.14100(b) · $336.00 proposed penalty
General requirements.
Lyons Mine · 140041330 CFR 57.4200(b)(2) · $336.00 proposed penalty
General requirements.
Lyons Mine · 140041330 CFR 57.4200(b)(2) · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.