← Lopez Ready Mix

Lopez Ready Mix safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F038ECD
    LOPEZ READY MIX PIT · 4103156

    4.3 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F03690B
    LOPEZ READY MIX PIT · 4103156

    4.3 on-site hours reported

  3. Handrails and toeboards.

    violationRecord 5005132
    LOPEZ READY MIX PIT · 4103156

    30 CFR 56.11002 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  4. Construction and maintenance of guards.

    violationRecord 5005131
    LOPEZ READY MIX PIT · 4103156

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord F01B1AF
    LOPEZ READY MIX PIT · 4103156

    9.0 on-site hours reported

  6. Examination of working places.

    violationRecord 5006830
    LOPEZ READY MIX PIT · 4103156

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $398.00 proposed penalty

  7. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5006829
    LOPEZ READY MIX PIT · 4103156

    30 CFR 50.30(a) · $151.00 proposed penalty

  8. Berms or guardrails.

    violationRecord 5006828
    LOPEZ READY MIX PIT · 4103156

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $398.00 proposed penalty

  9. Correction of dangerous conditions.

    violationRecord 5006827
    LOPEZ READY MIX PIT · 4103156

    30 CFR 56.12030 · $151.00 proposed penalty

  10. Construction and maintenance of guards.

    violationRecord 5006826
    LOPEZ READY MIX PIT · 4103156

    30 CFR 56.14112(b) · $151.00 proposed penalty

  11. Moving machine parts.

    violationRecord 5006825
    LOPEZ READY MIX PIT · 4103156

    30 CFR 56.14107(a) · $151.00 proposed penalty

  12. Site-specific hazard awareness training.

    violationRecord 5006824
    LOPEZ READY MIX PIT · 4103156

    30 CFR 46.11(b) · Significant and substantial (S&S) · $168.00 proposed penalty

  13. Site-specific hazard awareness training.

    violationRecord 5006823
    LOPEZ READY MIX PIT · 4103156

    30 CFR 46.11(b) · Significant and substantial (S&S) · $168.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F01875A
    LOPEZ READY MIX PIT · 4103156

    4.8 on-site hours reported

  15. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9797949
    LOPEZ READY MIX PIT · 4103156

    30 CFR 50.30(a) · $165.00 proposed penalty

  16. Construction and maintenance of guards.

    violationRecord 9797948
    LOPEZ READY MIX PIT · 4103156

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  17. Moving machine parts.

    violationRecord 9797947
    LOPEZ READY MIX PIT · 4103156

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.