← Kratos Resources, LLC

Kratos Resources, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Spot Inspection

    inspectionRecord F011603
    #9A · 1519116

    2.0 on-site hours reported

  2. Sealing of mines.

    violationRecord 5084031
    #9A · 1519116

    30 CFR 75.1711

  3. Sealing of mines.

    violationRecord 5084030
    #9A · 1519116

    30 CFR 75.1711 · $168.00 proposed penalty

  4. Spot Inspection

    inspectionRecord F015146
    #9A · 1519116

    1.0 on-site hours reported

  5. Openings of active mines.

    violationRecord 9778800
    #9A · 1519116

    30 CFR 75.1711-3

  6. Spot Inspections

    inspectionRecord F015145
    #9A · 1519116

    103(i) · 4.5 on-site hours reported

  7. Openings of active mines.

    violationRecord 9778799
    #9A · 1519116

    30 CFR 75.1711-3 · Significant and substantial (S&S) · $775.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F0142C9
    #9A · 1519116

    103(i) · 1.5 on-site hours reported

  9. Regular Safety and Health Inspection

    inspectionRecord F0115F4
    #9A · 1519116

    13.0 on-site hours reported

  10. Spot Inspection

    inspectionRecord F010AB8
    #9A · 1519116

    8.0 on-site hours reported

  11. Spot Inspections

    inspectionRecord F010772
    #9A · 1519116

    103(i) · 3.0 on-site hours reported

  12. Spot Inspections

    inspectionRecord F010AB3
    #9A · 1519116

    103(i) · 4.5 on-site hours reported

  13. Spot Inspections

    inspectionRecord F0142BD
    #9A · 1519116

    103(i) · 4.0 on-site hours reported

  14. Spot Inspections

    inspectionRecord F000702
    #9A · 1519116

    103(i) · 3.0 on-site hours reported

  15. Weekly examination.

    violationRecord 5084609
    #9A · 1519116

    30 CFR 75.364(a)(1) · $151.00 proposed penalty

  16. Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.

    violationRecord 5080015
    #9A · 1519116

    30 CFR 48.23(c)(2) · $151.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F0115E9
    #9A · 1519116

    103(i) · 5.0 on-site hours reported

  18. Regular Safety and Health Inspection

    inspectionRecord F010AAE
    #9A · 1519116

    62.0 on-site hours reported

  19. Spot Inspections

    inspectionRecord F01076A
    #9A · 1519116

    103(i) · 3.0 on-site hours reported

  20. Spot Inspections

    inspectionRecord F010767
    #9A · 1519116

    103(i) · 5.5 on-site hours reported

  21. Spot Inspections

    inspectionRecord F010AAC
    #9A · 1519116

    103(i) · 6.3 on-site hours reported

  22. Spot Inspections

    inspectionRecord F010AA9
    #9A · 1519116

    103(i) · 5.5 on-site hours reported

  23. Spot Inspections

    inspectionRecord F00038F
    #9A · 1519116

    103(i) · 5.0 on-site hours reported

  24. Spot Inspections

    inspectionRecord F0115DC
    #9A · 1519116

    103(i) · 12.0 on-site hours reported

  25. Permissible electric face equipment; maintenance.

    violationRecord 5084004
    #9A · 1519116

    30 CFR 75.503 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.