Safety activity
Safe access.
Kosmos Cement Plant · 150446930 CFR 56.11001 · $151.00 proposed penalty
Horns and backup alarms.
Kosmos Cement Plant · 150446930 CFR 56.14132(a) · $151.00 proposed penalty
Horns and backup alarms.
Kosmos Cement Plant · 150446930 CFR 56.14132(a) · $151.00 proposed penalty
Use of compressed air.
Kosmos Cement Plant · 150446930 CFR 56.13020 · Significant and substantial (S&S) · $226.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Kosmos Cement Plant · 150446930 CFR 56.12019 · $151.00 proposed penalty
Exits.
Kosmos Cement Plant · 150446930 CFR 56.4530 · $336.00 proposed penalty
Weatherproof lamp sockets.
Kosmos Cement Plant · 150446930 CFR 56.12035 · Significant and substantial (S&S) · $226.00 proposed penalty
Grounding circuit enclosures.
Kosmos Cement Plant · 150446930 CFR 56.12025 · $151.00 proposed penalty
General instructions for completing MSHA Form 7000-1.
Kosmos Cement Plant · 150446930 CFR 50.20-1 · $151.00 proposed penalty
Moving machine parts.
Kosmos Cement Plant · 150446930 CFR 56.14107(a) · $336.00 proposed penalty
Inspection and cover plates.
Kosmos Cement Plant · 150446930 CFR 56.12032 · $151.00 proposed penalty
Safe access.
Kosmos Cement Plant · 150446930 CFR 56.11001 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Safe access.
Kosmos Cement Plant · 150446930 CFR 56.11001 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Testing grounding systems.
Kosmos Cement Plant · 150446930 CFR 56.12028 · $336.00 proposed penalty
Moving machine parts.
Kosmos Cement Plant · 150446930 CFR 56.14107(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Safe access.
Kosmos Cement Plant · 150446930 CFR 56.11001 · Significant and substantial (S&S) · $288.00 proposed penalty
Identification of power switches.
Kosmos Cement Plant · 150446930 CFR 56.12018 · $151.00 proposed penalty
Correction of dangerous conditions.
Kosmos Cement Plant · 150446930 CFR 56.12030 · $151.00 proposed penalty
Identification of power switches.
Kosmos Cement Plant · 150446930 CFR 56.12018 · $151.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Kosmos Cement Plant · 150446930 CFR 56.12019 · $151.00 proposed penalty
Housekeeping.
Kosmos Cement Plant · 150446930 CFR 56.20003(a) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Kosmos Cement Plant · 150446930 CFR 56.14100(b) · $366.00 proposed penalty
Distribution boxes.
Kosmos Cement Plant · 150446930 CFR 56.12006 · $432.00 proposed penalty
Inspection and cover plates.
Kosmos Cement Plant · 150446930 CFR 56.12032 · $432.00 proposed penalty
Housekeeping.
Kosmos Cement Plant · 150446930 CFR 56.20003(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.