← Knight Hawk Coal LLC

Knight Hawk Coal LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Inspection of fire suppression devices.

    violationRecord 5016946
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1107-16(b)

  2. Roof control plan.

    violationRecord 9548793
    Prairie Eagle-Underground · 1103147

    30 CFR 75.220(a)(1) · Significant and substantial (S&S)

  3. Roof control plan.

    violationRecord 9548792
    Prairie Eagle-Underground · 1103147

    30 CFR 75.220(a)(1) · Significant and substantial (S&S)

  4. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5016945
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1910(d)

  5. Spot Inspections

    inspectionRecord F03ABAA
    Prairie Eagle-Underground · 1103147

    103(i) · 6.5 on-site hours reported

  6. Quantity and location of firefighting equipment.

    violationRecord 5016944
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1100-2(b) · $226.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5016943
    Prairie Eagle-Underground · 1103147

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  8. Roof control plan.

    violationRecord 9548791
    Prairie Eagle-Underground · 1103147

    30 CFR 75.220(a)(1) · Significant and substantial (S&S)

  9. Roof control plan.

    violationRecord 9548789
    Prairie Eagle-Underground · 1103147

    30 CFR 75.220(a)(1) · Significant and substantial (S&S)

  10. Permissible electric face equipment; maintenance.

    violationRecord 5016942
    Prairie Eagle-Underground · 1103147

    30 CFR 75.503 · $432.00 proposed penalty

  11. Roof bolting.

    violationRecord 5016941
    Prairie Eagle-Underground · 1103147

    30 CFR 75.204(c)(1) · Significant and substantial (S&S)

  12. Mine ventilation plan; submission and approval.

    violationRecord 5016940
    Prairie Eagle-Underground · 1103147

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  13. Permissible electric face equipment; maintenance.

    violationRecord 5016939
    Prairie Eagle-Underground · 1103147

    30 CFR 75.503 · $432.00 proposed penalty

  14. Inspection of fire suppression devices.

    violationRecord 5016938
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1107-16(b) · $226.00 proposed penalty

  15. Preshift examination at fixed intervals.

    violationRecord 5016852
    Prairie Eagle-Underground · 1103147

    30 CFR 75.360(b)(10) · Significant and substantial (S&S)

  16. Protection from falls of roof, face and ribs.

    violationRecord 5016851
    Prairie Eagle-Underground · 1103147

    30 CFR 75.202(a) · Significant and substantial (S&S)

  17. Protection from falls of roof, face and ribs.

    violationRecord 5016531
    Prairie Eagle-Underground · 1103147

    30 CFR 75.202(a) · $336.00 proposed penalty

  18. Accumulations of combustible materials.

    violationRecord 5012483
    Hawkeye Mine · 1103226

    30 CFR 77.1104 · $151.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F01B413
    Prairie Eagle-Underground · 1103147

    103(i) · 7.0 on-site hours reported

  20. Regular Safety and Health Inspection

    inspectionRecord F02C076
    Black Hawk · 1103248

    11.0 on-site hours reported

  21. Roof control plan.

    violationRecord 9548787
    Prairie Eagle-Underground · 1103147

    30 CFR 75.220(a)(1) · $1,126.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 5016850
    Prairie Eagle-Underground · 1103147

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  23. Cable fittings; suitability.

    violationRecord 5016849
    Prairie Eagle-Underground · 1103147

    30 CFR 75.515 · $755.00 proposed penalty

  24. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5011090
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1910(j) · $226.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5011089
    Prairie Eagle-Underground · 1103147

    30 CFR 75.400 · $432.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.