Handrails and toeboards.
Klotz Sand Co., Inc. · 140157130 CFR 56.11002 · Significant and substantial (S&S) · $151.00 proposed penalty
Protection for openings around travelways.
Klotz Sand Co., Inc. · 140157130 CFR 56.11012 · $313.00 proposed penalty
Distribution boxes.
Klotz Sand Co., Inc. · 140157130 CFR 56.12006 · $151.00 proposed penalty
Regular Safety and Health Inspection
Klotz Sand Co., Inc. · 140157117.3 on-site hours reported
Examination of working places.
DODGE CITY PORTABLE · 140171430 CFR 56.18002(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Housekeeping.
DODGE CITY PORTABLE · 140171430 CFR 56.20003(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Moving machine parts.
DODGE CITY PORTABLE · 140171430 CFR 56.14107(a) · $288.00 proposed penalty
Inspection and cover plates.
DODGE CITY PORTABLE · 140171430 CFR 56.12032 · $642.00 proposed penalty
Handrails and toeboards.
DODGE CITY PORTABLE · 140171430 CFR 56.11002 · Significant and substantial (S&S) · $959.00 proposed penalty
Moving machine parts.
DODGE CITY PORTABLE · 140171430 CFR 56.14107(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Moving machine parts.
DODGE CITY PORTABLE · 140171430 CFR 56.14107(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Regular Safety and Health Inspection
DODGE CITY PORTABLE · 140171410.8 on-site hours reported
Compliance Follow-up Inspection
Klotz Sand Company Incorporated #2 · 14013373.3 on-site hours reported
Examination of working places.
Portable Plant CO · 140133830 CFR 56.18002(b) · $151.00 proposed penalty
Wall, bank, and slope stability.
Portable Plant CO · 140133830 CFR 56.3130 · Significant and substantial (S&S) · $398.00 proposed penalty
Warning signs.
Portable Plant CO · 140133830 CFR 56.4101 · $151.00 proposed penalty
Regular Safety and Health Inspection
Portable Plant CO · 140133812.3 on-site hours reported
Written safety program.
Klotz Sand Company Incorporated #2 · 140133730 CFR 56.23002(a) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Klotz Sand Company Incorporated #2 · 140133730 CFR 56.14207 · $151.00 proposed penalty
Site-specific hazard awareness training.
Klotz Sand Company Incorporated #2 · 140133730 CFR 46.11(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
Klotz Sand Company Incorporated #2 · 14013377.0 on-site hours reported
Traffic control.
Klotz Sand Company Incorporated #2 · 140133730 CFR 56.9100(b) · $151.00 proposed penalty
Protection of power conductors from mobile equipment.
Klotz Sand Company Incorporated #2 · 140133730 CFR 56.12005 · Significant and substantial (S&S) · $465.00 proposed penalty
Moving machine parts.
Klotz Sand Company Incorporated #2 · 140133730 CFR 56.14107(a) · $151.00 proposed penalty
Moving machine parts.
Klotz Sand Company Incorporated #2 · 140133730 CFR 56.14107(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.