KINGSTON SEWELL · 460963130 CFR 75.1505(a) · $151.00 proposed penalty
Communications facilities; refuge alternatives.
KINGSTON SEWELL · 460963130 CFR 75.1600-3(a)(1) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
KINGSTON SEWELL · 460963130 CFR 75.380(d)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Kingston No. 2 · 460893230 CFR 75.370(a)(1) · $755.00 proposed penalty
Rock dusting.
Kingston No. 2 · 460893230 CFR 75.402 · $151.00 proposed penalty
Regular Safety and Health Inspection
Kingston No. 2 · 4608932338.8 on-site hours reported
Regular Safety and Health Inspection
KINGSTON SEWELL · 460963180.5 on-site hours reported
Protection from falls of roof, face and ribs.
KINGSTON SEWELL · 460963130 CFR 75.202(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
KINGSTON SEWELL · 460963130 CFR 75.363(a) · Significant and substantial (S&S) · $267.00 proposed penalty
Sampling; general and technical requirements.
KINGSTON SEWELL · 460963130 CFR 70.201(c) · $151.00 proposed penalty
Spot Inspection
KINGSTON SEWELL · 46096315.0 on-site hours reported
Shaft, Slope or Major Construction Spot Inspection
KINGSTON SEWELL · 46096314.0 on-site hours reported
Regular Safety and Health Inspection
Kingston Processing · 460434351.5 on-site hours reported
Electric equipment; examination, testing, and maintenance.
Kingston Processing · 460434330 CFR 77.502 · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
Kingston Processing · 460434330 CFR 77.1110 · $151.00 proposed penalty
Mechanical equipment guards.
Kingston Processing · 460434330 CFR 77.400(a) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Kingston Processing · 460434330 CFR 77.502 · $151.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
Kingston No. 2 · 460893230 CFR 75.1107-4(c) · $151.00 proposed penalty
Shaft, Slope or Major Construction Spot Inspection
KINGSTON SEWELL · 46096314.0 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
KINGSTON SEWELL · 460963130 CFR 77.1606(c) · $151.00 proposed penalty
Methane and oxygen deficiency tests; approved devices.
KINGSTON SEWELL · 460963130 CFR 77.1901-1 · $151.00 proposed penalty
Travelways at surface installations.
KINGSTON SEWELL · 460963130 CFR 77.205(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
Kingston No. 2 · 460893230 CFR 75.1101-10 · $151.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
Kingston No. 2 · 460893230 CFR 75.1107-4(c) · $151.00 proposed penalty
Shaft, Slope or Major Construction Spot Inspection
KINGSTON SEWELL · 46096312.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.