Benjamin · 420252830 CFR 56.14100(c) · $151.00 proposed penalty
Moving machine parts.
Benjamin · 420252830 CFR 56.14107(a) · $151.00 proposed penalty
Drill dust control.
Benjamin · 420252830 CFR 58.620 · Significant and substantial (S&S) · $313.00 proposed penalty
Safety defects; examination, correction and records.
Benjamin · 420252830 CFR 56.14100(a) · $151.00 proposed penalty
Brakes.
Grantsville Pit · 420263730 CFR 56.14101(a)(2) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Regular Safety and Health Inspection
Bluffdale Pit · 42021797.0 on-site hours reported
Moving machine parts.
Bluffdale Pit · 420217930 CFR 56.14107(a) · $1,320.00 proposed penalty
Horns and backup alarms.
Bluffdale Pit · 420217930 CFR 56.14132(b)(2) · $151.00 proposed penalty
Electrical conductors.
Bluffdale Pit · 420217930 CFR 56.12004 · $1,320.00 proposed penalty
Electrical conductors.
Bluffdale Pit · 420217930 CFR 56.12004 · $1,320.00 proposed penalty
Moving machine parts.
Bluffdale Pit · 420217930 CFR 56.14107(a) · $1,320.00 proposed penalty
Compliance Follow-up Inspection
Pit #1 43rd Ave · 02028671.0 on-site hours reported
Regular Safety and Health Inspection
Parley's Stone · 42021026.0 on-site hours reported
Insulation and fittings for power wires and cables.
Parley's Stone · 420210230 CFR 56.12008 · $504.00 proposed penalty
Construction and maintenance of guards.
Parley's Stone · 420210230 CFR 56.14112(a)(1) · $504.00 proposed penalty
Moving machine parts.
Parley's Stone · 420210230 CFR 56.14107(a) · Significant and substantial (S&S) · $5,574.00 proposed penalty
Construction and maintenance of guards.
Parley's Stone · 420210230 CFR 56.14112(a)(1) · $504.00 proposed penalty
Regular Safety and Health Inspection
Grantsville Pit · 42026378.0 on-site hours reported
Inspection.
Grantsville Pit · 420263730 CFR 56.4201(a)(2) · $151.00 proposed penalty
Inspection.
Grantsville Pit · 420263730 CFR 56.4201(a)(2) · $288.00 proposed penalty
Construction and maintenance of ladders.
Grantsville Pit · 420263730 CFR 56.11003 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Regular Safety and Health Inspection
HIGHLAND PIT · 420094113.0 on-site hours reported
Moving machine parts.
HIGHLAND PIT · 420094130 CFR 56.14107(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Electrical conductors.
HIGHLAND PIT · 420094130 CFR 56.12004 · $1,219.00 proposed penalty
Housekeeping.
HIGHLAND PIT · 420094130 CFR 56.20003(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.