Kepler Processing Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Examination and maintenance of firefighting equipment.
Kepler No. 1 Prep Plant · 460463730 CFR 77.1110 · $151.00 proposed penalty
Loading and haulage equipment; installations.
Kepler No. 1 Prep Plant · 460463730 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; operation.
Kepler No. 1 Prep Plant · 460463730 CFR 77.1607(d) · $151.00 proposed penalty
Mechanical equipment guards.
Kepler No. 1 Prep Plant · 460463730 CFR 77.400(a) · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
Kepler No. 1 Prep Plant · 460463730 CFR 77.1110 · $151.00 proposed penalty
Surface installations; general.
Kepler No. 1 Prep Plant · 460463730 CFR 77.200 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Travelways at surface installations.
Kepler No. 1 Prep Plant · 460463730 CFR 77.205(b) · Significant and substantial (S&S) · $313.00 proposed penalty
Dust accumulations in surface installations.
Kepler No. 1 Prep Plant · 460463730 CFR 77.202 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Kepler No. 1 Prep Plant · 460463730 CFR 77.502 · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
Kepler No. 1 Prep Plant · 460463730 CFR 77.1110 · $151.00 proposed penalty
Surface installations; general.
Kepler No. 1 Prep Plant · 460463730 CFR 77.200 · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
Kepler No. 1 Prep Plant · 460463730 CFR 77.1110 · $151.00 proposed penalty
Surface installations; general.
Kepler No. 1 Prep Plant · 460463730 CFR 77.200 · $151.00 proposed penalty
Dust accumulations in surface installations.
Kepler No. 1 Prep Plant · 460463730 CFR 77.202 · $151.00 proposed penalty
Surface installations; general.
Kepler No. 1 Prep Plant · 460463730 CFR 77.200 · $151.00 proposed penalty
Mechanical equipment guards.
Kepler No. 1 Prep Plant · 460463730 CFR 77.400(a) · $151.00 proposed penalty
Dust accumulations in surface installations.
Kepler No. 1 Prep Plant · 460463730 CFR 77.202 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Kepler No. 1 Prep Plant · 460463730 CFR 77.502 · $151.00 proposed penalty
Travelways at surface installations.
Kepler No. 1 Prep Plant · 460463730 CFR 77.205(b) · $151.00 proposed penalty
Mechanical equipment guards.
Kepler No. 1 Prep Plant · 460463730 CFR 77.400(a) · $151.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
Kepler No. 1 Prep Plant · 460463730 CFR 77.1713(a) · $151.00 proposed penalty
Electrical Technical Investigation
Kepler No. 1 Prep Plant · 460463712.0 on-site hours reported
Regular Safety and Health Inspection
Kepler No. 1 Prep Plant · 460463794.5 on-site hours reported
Electric equipment; examination, testing, and maintenance.
Kepler No. 1 Prep Plant · 460463730 CFR 77.502 · $151.00 proposed penalty
Impoundment Spot Inspection
Kepler No. 1 Prep Plant · 46046372.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.