Kennedy Creek Quarry Incorporated safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Action level.
Portable 1 · 450380030 CFR 62.120 · $151.00 proposed penalty
Spot Inspection
Portable 1 · 450380011.0 on-site hours reported
Compliance Follow-up Inspection
Portable 1 · 45038001.0 on-site hours reported
Compliance Follow-up Inspection
Kennedy Creek Quarry · 45030660.8 on-site hours reported
Compliance Follow-up Inspection
Portable 1 · 45038001.5 on-site hours reported
Compliance Follow-up Inspection
Kennedy Creek Quarry · 45030662.3 on-site hours reported
Horns and backup alarms.
Portable 1 · 450380030 CFR 56.14132(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Portable 1 · 450380030 CFR 56.14100(b) · $151.00 proposed penalty
Operators stations.
Portable 1 · 450380030 CFR 56.14103(b) · $151.00 proposed penalty
Flying or falling materials.
Portable 1 · 450380030 CFR 56.14110 · $151.00 proposed penalty
Brakes.
Portable 1 · 450380030 CFR 56.14101(a)(2) · $288.00 proposed penalty
Moving machine parts.
Portable 1 · 450380030 CFR 56.14107(a) · $151.00 proposed penalty
Inspection and cover plates.
Portable 1 · 450380030 CFR 56.12032 · $151.00 proposed penalty
Flying or falling materials.
Portable 1 · 450380030 CFR 56.14110 · $151.00 proposed penalty
Safe access.
Portable 1 · 450380030 CFR 56.11001 · $151.00 proposed penalty
Regular Safety and Health Inspection
Portable 1 · 45038005.8 on-site hours reported
Safety defects; examination, correction and records.
Kennedy Creek Quarry · 450306630 CFR 56.14100(b) · $697.00 proposed penalty
Regular Safety and Health Inspection
Kennedy Creek Quarry · 450306618.0 on-site hours reported
Housekeeping.
Kennedy Creek Quarry · 450306630 CFR 56.20003(a) · $209.00 proposed penalty
Brakes.
Kennedy Creek Quarry · 450306630 CFR 56.14101(a)(3) · $697.00 proposed penalty
Inspection and cover plates.
Kennedy Creek Quarry · 450306630 CFR 56.12032 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Compliance Follow-up Inspection
Kennedy Creek Quarry · 45030661.5 on-site hours reported
Safety can use.
Portable 1 · 450380030 CFR 56.4402 · $151.00 proposed penalty
Parking procedures for unattended equipment.
Portable 1 · 450380030 CFR 56.14207 · $151.00 proposed penalty
Berms or guardrails.
Portable 1 · 450380030 CFR 56.9300(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.