  1. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5097258
    Ceredo Dock · 4609051

    30 CFR 77.1606(c) · $267.00 proposed penalty

  2. Continuous methane monitoring device; installation and operation; automatic deenergization of electric equipment.

    violationRecord 5097257
    Ceredo Dock · 4609051

    30 CFR 77.211-1 · $151.00 proposed penalty

  3. Accumulations of combustible materials.

    violationRecord 5097237
    Ceredo Dock · 4609051

    30 CFR 77.1104 · $151.00 proposed penalty

  4. Electric equipment; examination, testing, and maintenance.

    violationRecord 5097236
    Ceredo Dock · 4609051

    30 CFR 77.502 · Significant and substantial (S&S) · $504.00 proposed penalty

  5. Escape and evacuation; plan.

    violationRecord 5097235
    Ceredo Dock · 4609051

    30 CFR 77.1101(c) · $151.00 proposed penalty

  6. Loading and haulage equipment; installations.

    violationRecord 5097234
    Ceredo Dock · 4609051

    30 CFR 77.1605(d) · $151.00 proposed penalty

  7. Machinery and equipment; operation and maintenance.

    violationRecord 5097233
    Ceredo Dock · 4609051

    30 CFR 77.404(a) · Significant and substantial (S&S) · $226.00 proposed penalty

  8. Escape and evacuation; plan.

    violationRecord 5097232
    Ceredo Dock · 4609051

    30 CFR 77.1101(c) · $151.00 proposed penalty

  9. Escape and evacuation; plan.

    violationRecord 5097231
    Ceredo Dock · 4609051

    30 CFR 77.1101(c) · $151.00 proposed penalty

  10. Dust accumulations in surface installations.

    violationRecord 5097230
    Ceredo Dock · 4609051

    30 CFR 77.202 · $151.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord 7048267
    Ceredo Dock · 4609051

    61.8 on-site hours reported

  12. Slip or fall of person

    accidentRecord 220253640001
    Ceredo Dock · 4609051

    Days away from work only

    Accident narrative

    While exiting the read door on the engineer side of locomotive #1200 to set the hand brake the employee stumbled down the two steps to the cat walk. The employee was carrying a lunch bucket therefore had no way to catch self resulting in a broken right leg and fractured right ankle. The area was dry and had zero moisture accumulation. Area was well lit. Approximately 47F out.

  13. Regular Safety and Health Inspection

    inspectionRecord F00CCF7
    Quincy Dock · 4607736

    59.3 on-site hours reported

  14. Powered haulage

    accidentRecord 220253450005
    Quincy Dock · 4607736

    Days away from work only

    Accident narrative

    EE backed up to coal pile at Quincy Dock to dump a load of coal. EE raised EE's bed about 2 stages and the tailgate did not release. At that time EE lowered the bed but the dump bed was leaning too much and the truck turned over - truck and trailer both damaged, EE sustained 2 broken ribs and a bruised leg.

  15. Non-Fatal Accident Investigation

    inspectionRecord 6321448
    Quincy Dock · 4607736

    7.5 on-site hours reported

  16. Machinery and equipment; operation and maintenance.

    violationRecord 5022631
    Quincy Dock · 4607736

    30 CFR 77.404(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  17. Inspection and cover plates.

    violationRecord 5099653
    Ceredo Dock · 4609051

    30 CFR 77.512 · $151.00 proposed penalty

  18. Hoisting of materials.

    violationRecord 5099652
    Ceredo Dock · 4609051

    30 CFR 77.210(a) · $151.00 proposed penalty

  19. Mechanical equipment guards.

    violationRecord 5099651
    Ceredo Dock · 4609051

    30 CFR 77.400(d) · $151.00 proposed penalty

  20. Tests for methane; qualified person; use of approved device.

    violationRecord 5099650
    Ceredo Dock · 4609051

    30 CFR 77.201-1 · $151.00 proposed penalty

  21. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5099649
    Ceredo Dock · 4609051

    30 CFR 77.1606(c) · $151.00 proposed penalty

  22. Electric equipment; examination, testing, and maintenance.

    violationRecord 5099648
    Ceredo Dock · 4609051

    30 CFR 77.502 · $151.00 proposed penalty

  23. Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.

    violationRecord 5099647
    Ceredo Dock · 4609051

    30 CFR 48.23(c)(3) · $151.00 proposed penalty

  24. Training of new miners; minimum courses of instruction; hours of instruction.

    violationRecord 5099646
    Ceredo Dock · 4609051

    30 CFR 48.25(a) · Significant and substantial (S&S) · $909.00 proposed penalty

  25. Accumulations of combustible materials.

    violationRecord 5099645
    Ceredo Dock · 4609051

    30 CFR 77.1104 · Significant and substantial (S&S) · $3,022.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.