Kanawha Eagle Mining, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5026320
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  2. Installation of water sprinkler systems; requirements.

    violationRecord 5026319
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1101-7(c) · $151.00 proposed penalty

  3. Mechanical equipment guards.

    violationRecord 5026318
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $697.00 proposed penalty

  4. Machinery and equipment; operation and maintenance.

    violationRecord 5026317
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 5020403
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.202(a) · $151.00 proposed penalty

  6. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5020402
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1600-2(e) · $151.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F00C099
    NORTH EAGLE MINE · 4608759

    103(i) · 5.0 on-site hours reported

  8. Permissible electric face equipment; maintenance.

    violationRecord 5027936
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.503 · $151.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5027935
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.400 · $151.00 proposed penalty

  10. Electric equipment; examination, testing and maintenance.

    violationRecord 5027934
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.512 · $151.00 proposed penalty

  11. Mining methods.

    violationRecord 5027933
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.203(e)(2) · $151.00 proposed penalty

  12. Escapeways; bituminous and lignite mines.

    violationRecord 5027932
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty

  13. Verbal Hazard Complaint Inspections

    inspectionRecord 6320449
    Winchester Peerless Rachel Mine · 4609258

    1.5 on-site hours reported

  14. Escapeways; bituminous and lignite mines.

    violationRecord 5023580
    NORTH EAGLE MINE · 4608759

    30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty

  15. Cable fittings; suitability.

    violationRecord 5023579
    NORTH EAGLE MINE · 4608759

    30 CFR 75.515 · $151.00 proposed penalty

  16. Cable fittings; suitability.

    violationRecord 5023578
    NORTH EAGLE MINE · 4608759

    30 CFR 75.515 · $151.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5026316
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5026315
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  19. Preshift examination at fixed intervals.

    violationRecord 5026314
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.360(g) · $151.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F00BE61
    NORTH EAGLE MINE · 4608759

    103(i) · 6.5 on-site hours reported

  21. Spot Inspections

    inspectionRecord F006736
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 7.0 on-site hours reported

  22. Mine ventilation plan; submission and approval.

    violationRecord 5026313
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5020401
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.202(a) · $151.00 proposed penalty

  24. Ventilation controls.

    violationRecord 5020400
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.333(h) · $209.00 proposed penalty

  25. Roof control plan.

    violationRecord 5020399
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.220(a)(1) · $165.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.