J & H Services Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Verbal Hazard Complaint Inspections
Finch Pit · 29025543.8 on-site hours reported
Regular Safety and Health Inspection
Finch Pit · 290255425.0 on-site hours reported
Compliance Follow-up Inspection
Cactus Pit · 29025520.5 on-site hours reported
First aid.
Cactus Pit · 290255230 CFR 56.18010 · $165.00 proposed penalty
Testing grounding systems.
Cactus Pit · 290255230 CFR 56.12028 · $245.00 proposed penalty
Regular Safety and Health Inspection
Cactus Pit · 29025523.5 on-site hours reported
Safety defects; examination, correction and records.
Cactus Pit · 290255230 CFR 56.14100(c) · $165.00 proposed penalty
Combustible waste.
Cactus Pit · 290255230 CFR 56.4104 · $165.00 proposed penalty
Oxygen cylinder storage.
Cactus Pit · 290255230 CFR 56.4601 · $165.00 proposed penalty
Securing gas cylinders.
Cactus Pit · 290255230 CFR 56.16005 · $165.00 proposed penalty
Electrical conductors.
Cactus Pit · 290255230 CFR 56.12004 · $165.00 proposed penalty
Safety defects; examination, correction and records.
Cactus Pit · 290255230 CFR 56.14100(c) · $245.00 proposed penalty
Safe access.
Cactus Pit · 290255230 CFR 56.11001 · Significant and substantial (S&S) · $818.00 proposed penalty
Construction and maintenance of guards.
Cactus Pit · 290255230 CFR 56.14112(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Training plan implementation.
Finch Pit · 290255430 CFR 46.4(a)(2) · $313.00 proposed penalty
Safety defects; examination, correction and records.
Finch Pit · 290255430 CFR 56.14100(c) · $313.00 proposed penalty
Safety defects; examination, correction and records.
Finch Pit · 290255430 CFR 56.14100(a) · $313.00 proposed penalty
Brakes.
Finch Pit · 290255430 CFR 56.14101(a)(2) · $313.00 proposed penalty
Violation — cited standard not reported
Finch Pit · 2902554$168.00 proposed penalty
Insulation and fittings for power wires and cables.
Finch Pit · 290255430 CFR 56.12008 · $151.00 proposed penalty
Dump site restraints.
Finch Pit · 290255430 CFR 56.9301 · $151.00 proposed penalty
Correction of dangerous conditions.
Finch Pit · 290255430 CFR 56.12030 · $151.00 proposed penalty
Regular Safety and Health Inspection
Finch Pit · 290255428.5 on-site hours reported
Brakes.
Finch Pit · 290255430 CFR 56.14101(a)(2) · $151.00 proposed penalty
Electrical conductors.
Finch Pit · 290255430 CFR 56.12004 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.