← Itmann Mining Company LP

Itmann Mining Company LP safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Frequency of examinations.

    violationRecord 5028574
    Itmann No 5 · 4609569

    30 CFR 75.512-2 · $151.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5028573
    Itmann No 5 · 4609569

    30 CFR 75.512 · $642.00 proposed penalty

  3. Drill dust control at underground areas of underground mines.

    violationRecord 5028572
    Itmann No 5 · 4609569

    30 CFR 72.630(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  4. Condition and examination of firefighting equipment.

    violationRecord 5028571
    Itmann No 5 · 4609569

    30 CFR 75.1100-3 · $267.00 proposed penalty

  5. Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.

    violationRecord 5028570
    Itmann No 5 · 4609569

    30 CFR 75.363(b) · $151.00 proposed penalty

  6. Maintenance of incombustible content of rock dust.

    violationRecord 5028569
    Itmann No 5 · 4609569

    30 CFR 75.403 · $177.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F020DA5
    Itmann No 5 · 4609569

    103(i) · 7.8 on-site hours reported

  8. Methane monitors.

    violationRecord 5099358
    Itmann No 5 · 4609569

    30 CFR 75.342(a)(4) · $592.00 proposed penalty

  9. Map locations of self-contained self-rescuers (SCSR).

    violationRecord 5099357
    Itmann No 5 · 4609569

    30 CFR 75.1714-5 · $151.00 proposed penalty

  10. Spot Inspections

    inspectionRecord 6322888
    Itmann No 5 · 4609569

    103(i) · 6.5 on-site hours reported

  11. Mine ventilation plan; submission and approval.

    violationRecord 9554309
    Itmann No 5 · 4609569

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  12. Mine map.

    violationRecord 5028568
    Itmann No 5 · 4609569

    30 CFR 75.1200 · $432.00 proposed penalty

  13. Atmospheric monitoring systems.

    violationRecord 5028567
    Itmann No 5 · 4609569

    30 CFR 75.351(n)(3)(i) · $177.00 proposed penalty

  14. Electric equipment; examination, testing and maintenance.

    violationRecord 5028566
    Itmann No 5 · 4609569

    30 CFR 75.512 · $193.00 proposed penalty

  15. Inspection of fire suppression devices.

    violationRecord 5028565
    Itmann No 5 · 4609569

    30 CFR 75.1107-16(b) · $267.00 proposed penalty

  16. Roof control plan.

    violationRecord 5028564
    Itmann No 5 · 4609569

    30 CFR 75.220(a)(1) · $193.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5028563
    Itmann No 5 · 4609569

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5028562
    Itmann No 5 · 4609569

    30 CFR 75.512 · $177.00 proposed penalty

  19. Escapeway maps.

    violationRecord 5028561
    Itmann No 5 · 4609569

    30 CFR 75.1505(a)(3) · $177.00 proposed penalty

  20. Maintenance of incombustible content of rock dust.

    violationRecord 5028560
    Itmann No 5 · 4609569

    30 CFR 75.403 · $398.00 proposed penalty

  21. Maintenance of incombustible content of rock dust.

    violationRecord 5028559
    Itmann No 5 · 4609569

    30 CFR 75.403 · $398.00 proposed penalty

  22. Maintenance of incombustible content of rock dust.

    violationRecord 5028558
    Itmann No 5 · 4609569

    30 CFR 75.403 · $398.00 proposed penalty

  23. Spot Inspections

    inspectionRecord F020DA4
    Itmann No 5 · 4609569

    103(i) · 5.0 on-site hours reported

  24. Protection from falls of roof, face and ribs.

    violationRecord 5099348
    Itmann No 5 · 4609569

    30 CFR 75.202(a) · $165.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5028557
    Itmann No 5 · 4609569

    30 CFR 75.202(a) · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.