Itmann Mining Company LP safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
Itmann No 5 · 460956930 CFR 72.630(b) · $151.00 proposed penalty
Ventilation controls.
Itmann No 5 · 460956930 CFR 75.333(h) · $151.00 proposed penalty
Criteria—Haulage; general.
Itmann No 5 · 460956930 CFR 75.1403-10(i) · Significant and substantial (S&S) · $592.00 proposed penalty
Permissible electric face equipment; maintenance.
Itmann No 5 · 460956930 CFR 75.503 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Itmann No 5 · 460956930 CFR 75.1725(a) · Significant and substantial (S&S) · $592.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 7.8 on-site hours reported
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
Itmann No 5 · 460956930 CFR 75.1714-3(a) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Itmann No 5 · 460956930 CFR 75.512 · $177.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $151.00 proposed penalty
Criteria—Belt conveyors.
Itmann No 5 · 460956930 CFR 75.1403-5(j) · $151.00 proposed penalty
Flammable liquids; storage.
Itmann No 5 · 460956930 CFR 77.1103(d) · $151.00 proposed penalty
Preshift examination at fixed intervals.
Itmann No 5 · 460956930 CFR 75.360(b)(4) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Itmann No 5 · 460956930 CFR 75.503 · $151.00 proposed penalty
Ventilation controls.
Itmann No 5 · 460956930 CFR 75.333(c)(3) · $151.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 6.5 on-site hours reported
Permissible electric face equipment; maintenance.
Itmann No 5 · 460956930 CFR 75.503 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Itmann No 5 · 460956930 CFR 75.512 · $151.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 8.3 on-site hours reported
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Itmann No 5 · 460956930 CFR 75.1731(a) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Itmann No 5 · 460956930 CFR 75.503 · $151.00 proposed penalty
Additional self-contained self-rescuers (SCSRs).
Itmann No 5 · 460956930 CFR 75.1714-4(e) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Itmann No 5 · 460956930 CFR 75.1725(a) · $592.00 proposed penalty
Verbal Hazard Complaint Inspections
Itmann No 5 · 460956929.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.