  1. Mine ventilation plan; submission and approval.

    violationRecord 9837743
    Itmann No 5 · 4609569

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  2. Power wires and cables; insulation and protection.

    violationRecord 9838675
    Itmann No 5 · 4609569

    30 CFR 75.517 · Significant and substantial (S&S) · $267.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 9838674
    Itmann No 5 · 4609569

    30 CFR 75.503 · $151.00 proposed penalty

  4. Violation — cited standard not reported

    violationRecord 9838673
    Itmann No 5 · 4609569
  5. Powered haulage

    accidentRecord 220250690017
    Itmann No 5 · 4609569

    Days away from work only

    Accident narrative

    EE was working at the #1 tail piece on the walkway side picking up rocks and inadvertently, a piece of rock measuring 8"x8x1/2"x3"thick bounced off the belt striking EE on the head.

  6. Non-Fatal Accident Investigation

    inspectionRecord F010C38
    Itmann No 5 · 4609569

    8.8 on-site hours reported

  7. Automatic fire sensor and warning device systems; examination and test requirements.

    violationRecord 9838672
    Itmann No 5 · 4609569

    30 CFR 75.1103-8(c) · $151.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 9838661
    Itmann No 5 · 4609569

    30 CFR 75.400 · $398.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9838660
    Itmann No 5 · 4609569

    30 CFR 75.1731(a) · $151.00 proposed penalty

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9838659
    Itmann No 5 · 4609569

    30 CFR 75.1731(b) · $151.00 proposed penalty

  11. Condition and examination of firefighting equipment.

    violationRecord 9838658
    Itmann No 5 · 4609569

    30 CFR 75.1100-3 · $151.00 proposed penalty

  12. Spot Inspections

    inspectionRecord F00197F
    Itmann No 5 · 4609569

    103(i) · 6.5 on-site hours reported

  13. Mine ventilation plan; submission and approval.

    violationRecord 9836983
    Itmann No 5 · 4609569

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  14. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 9839011
    Itmann No 5 · 4609569

    30 CFR 75.1600-2(e) · $151.00 proposed penalty

  15. Escapeway maps.

    violationRecord 9839010
    Itmann No 5 · 4609569

    30 CFR 75.1505(b) · $151.00 proposed penalty

  16. Mine map.

    violationRecord 9839009
    Itmann No 5 · 4609569

    30 CFR 75.1200 · $151.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 9838655
    Itmann No 5 · 4609569

    30 CFR 75.400 · $398.00 proposed penalty

  18. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 9838654
    Itmann No 5 · 4609569

    30 CFR 75.1101-10 · $151.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9838653
    Itmann No 5 · 4609569

    30 CFR 75.400 · $151.00 proposed penalty

  20. Inspection of fire suppression devices.

    violationRecord 9838652
    Itmann No 5 · 4609569

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 9839006
    Itmann No 5 · 4609569

    30 CFR 75.370(a)(1) · $177.00 proposed penalty

  22. On-shift examination.

    violationRecord 9839005
    Itmann No 5 · 4609569

    30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 9839004
    Itmann No 5 · 4609569

    30 CFR 75.202(a) · $267.00 proposed penalty

  24. Preshift examination at fixed intervals.

    violationRecord 9839003
    Itmann No 5 · 4609569

    30 CFR 75.360(g) · $151.00 proposed penalty

  25. Roof control plan.

    violationRecord 9838646
    Itmann No 5 · 4609569

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.