← Itmann Mining Company LP

Itmann Mining Company LP safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Ventilation controls.

    violationRecord 5090504
    Itmann No 5 · 4609569

    30 CFR 75.333(h) · $151.00 proposed penalty

  2. Preshift examination at fixed intervals.

    violationRecord 5090503
    Itmann No 5 · 4609569

    30 CFR 75.360(g) · $267.00 proposed penalty

  3. Diesel equipment inventory.

    violationRecord 5090501
    Itmann No 5 · 4609569

    30 CFR 72.520(a) · $273.00 proposed penalty

  4. Installation of electric equipment and conductors; permissibility.

    violationRecord 9838699
    Itmann No 5 · 4609569

    30 CFR 75.1002(a) · $151.00 proposed penalty

  5. Installation of electric equipment and conductors; permissibility.

    violationRecord 5090502
    Itmann No 5 · 4609569

    30 CFR 75.1002(a) · $151.00 proposed penalty

  6. Power wires and cables; insulation and protection.

    violationRecord 5090500
    Itmann No 5 · 4609569

    30 CFR 75.517 · Significant and substantial (S&S) · $883.00 proposed penalty

  7. Preshift examination at fixed intervals.

    violationRecord 9838698
    Itmann No 5 · 4609569

    30 CFR 75.360(g) · $151.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F001982
    Itmann No 5 · 4609569

    103(i) · 4.0 on-site hours reported

  9. Machinery and equipment; operation and maintenance.

    violationRecord 9838697
    Itmann No 5 · 4609569

    30 CFR 75.1725(a) · $398.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 9838696
    Itmann No 5 · 4609569

    30 CFR 75.503 · $151.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 9838695
    Itmann No 5 · 4609569

    30 CFR 75.400 · $151.00 proposed penalty

  12. Power wires and cables; insulation and protection.

    violationRecord 9838694
    Itmann No 5 · 4609569

    30 CFR 75.517 · $267.00 proposed penalty

  13. Electric equipment; examination, testing and maintenance.

    violationRecord 9838693
    Itmann No 5 · 4609569

    30 CFR 75.512 · $151.00 proposed penalty

  14. Roof control plan.

    violationRecord 9839727
    Itmann No 5 · 4609569

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F001980
    Itmann No 5 · 4609569

    103(i) · 4.0 on-site hours reported

  16. Drill dust control at underground areas of underground mines.

    violationRecord 9839725
    Itmann No 5 · 4609569

    30 CFR 72.630(b) · $151.00 proposed penalty

  17. Roof control plan.

    violationRecord 9839724
    Itmann No 5 · 4609569

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  18. Other safeguards.

    violationRecord 9838684
    Itmann No 5 · 4609569

    30 CFR 75.1403

  19. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 9838690
    Itmann No 5 · 4609569

    30 CFR 75.1714-3(a) · $398.00 proposed penalty

  20. Availability of approved self-rescue devices; instruction in use and location.

    violationRecord 9838689
    Itmann No 5 · 4609569

    30 CFR 75.1714(a) · $398.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 9838688
    Itmann No 5 · 4609569

    30 CFR 75.202(a) · $177.00 proposed penalty

  22. Ventilation controls.

    violationRecord 9838687
    Itmann No 5 · 4609569

    30 CFR 75.333(h) · $151.00 proposed penalty

  23. Inspection of fire suppression devices.

    violationRecord 9838686
    Itmann No 5 · 4609569

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  24. Criteria—Belt conveyors.

    violationRecord 9838685
    Itmann No 5 · 4609569

    30 CFR 75.1403-5(g) · $151.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F009F40
    Itmann No 5 · 4609569

    103(i) · 6.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.