Itmann Mining Company LP safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
Itmann No 5 · 460956930 CFR 75.370(a)(1) · $151.00 proposed penalty
Travelways at surface installations.
Itmann No.5 Plant · 460959830 CFR 77.205(b) · $151.00 proposed penalty
Ventilation controls.
Itmann No 5 · 460956930 CFR 75.333(h) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Itmann No 5 · 46095690.5 on-site hours reported
Preshift examination at fixed intervals.
Itmann No 5 · 460956930 CFR 75.360(b) · $818.00 proposed penalty
Mine ventilation plan; submission and approval.
Itmann No 5 · 460956930 CFR 75.370(d) · $818.00 proposed penalty
Protection from falls of roof, face and ribs.
Itmann No 5 · 460956930 CFR 75.202(a) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
Itmann No 5 · 460956930 CFR 75.380(d)(1) · $151.00 proposed penalty
Escapeway maps.
Itmann No 5 · 460956930 CFR 75.1505(b) · $818.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $288.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 9.8 on-site hours reported
Regular Safety and Health Inspection
Itmann No.5 Plant · 460959837.0 on-site hours reported
Permissible electric face equipment; maintenance.
Itmann No 5 · 460956930 CFR 75.503 · $226.00 proposed penalty
Power wires and cables; insulation and protection.
Itmann No 5 · 460956930 CFR 75.517 · $209.00 proposed penalty
Permissible electric face equipment; maintenance.
Itmann No 5 · 460956930 CFR 75.503 · $226.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $336.00 proposed penalty
Mechanical equipment guards.
Itmann No.5 Plant · 460959830 CFR 77.400(a) · $177.00 proposed penalty
Storage of materials.
Itmann No.5 Plant · 460959830 CFR 77.208(d) · $151.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 9.0 on-site hours reported
Mine ventilation plan; submission and approval.
Itmann No 5 · 460956930 CFR 75.370(a)(1) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Itmann No 5 · 460956930 CFR 75.1725(c) · $151.00 proposed penalty
Dust disease of lungs
Itmann No 5 · 4609569Occupatnal illness not deg 1-6
Accident narrative
EE has a sufficient degree of pneumoconiosis
Spot Inspections
Itmann No 5 · 4609569103(i) · 6.0 on-site hours reported
Methane monitors.
Itmann No 5 · 460956930 CFR 75.342(a)(4) · Significant and substantial (S&S) · $755.00 proposed penalty
Machinery
Itmann No 5 · 4609569No dys awy frm wrk,no rstr act
Accident narrative
EE was operating the #4 roof bolter on the #2 North section in the #2 entry. EE tried to line up the bolt with the hole using the drill pot of the roof bolter. EE inadvertently hit the rotation lever, causing the bolt to spin and wrapped their left hand around the bolt. Resulting in a dislocated small finger and received 4, sutures.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.