← Itmann Mining Company LP

Itmann Mining Company LP safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Other safeguards.

    violationRecord 5090296
    Itmann No 5 · 4609569

    30 CFR 75.1403

  2. Loading and haulage equipment; installations.

    violationRecord 5090295
    Itmann No 5 · 4609569

    30 CFR 77.1605(k) · Significant and substantial (S&S) · $465.00 proposed penalty

  3. Electrical connections or splices; suitability.

    violationRecord 5090294
    Itmann No 5 · 4609569

    30 CFR 77.504 · $209.00 proposed penalty

  4. Criteria—Belt conveyors.

    violationRecord 5092000
    Itmann No 5 · 4609569

    30 CFR 75.1403-5(g) · $697.00 proposed penalty

  5. Escapeway maps.

    violationRecord 5090599
    Itmann No 5 · 4609569

    30 CFR 75.1505(b) · $818.00 proposed penalty

  6. Preshift examination at fixed intervals.

    violationRecord 5090598
    Itmann No 5 · 4609569

    30 CFR 75.360(g) · $151.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F01D4C9
    Itmann No 5 · 4609569

    103(i) · 6.0 on-site hours reported

  8. Occupational skin diseases

    accidentRecord 220252380005
    Itmann No 5 · 4609569

    Occupatnal illness not deg 1-6

    Accident narrative

    EE was spreading calcium in the intake at break #13 on #1 belt. EE had allergic reaction causing a skin rash on both legs

  9. Roof control plan.

    violationRecord 9839084
    Itmann No 5 · 4609569

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 9839085
    Itmann No 5 · 4609569

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  11. Protection from falls of roof, face and ribs.

    violationRecord 5091054
    Itmann No 5 · 4609569

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  12. Power centers.

    violationRecord 5091053
    Itmann No 5 · 4609569

    30 CFR 75.825(c) · $151.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5091052
    Itmann No 5 · 4609569

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $465.00 proposed penalty

  14. Fall of roof or back

    accidentRecord 220251430007
    Itmann No 5 · 4609569

    Days away from work only

    Accident narrative

    EE was operating the C/M in the #6 (right) entry on the #1 North Section MMU 005-0 right side. While backing the C/M out a piece of rock fell measuring 8" x5"L x30"w x7" thick striking EE in EE's lower back resulting in a broken L4 and L5. Along with a fractured pelvis and a slight tear to the outermost spinal area.

  15. Non-Fatal Accident Investigation

    inspectionRecord F00855E
    Itmann No 5 · 4609569

    10.8 on-site hours reported

  16. Violation — cited standard not reported

    violationRecord 9839081
    Itmann No 5 · 4609569
  17. Roof control plan.

    violationRecord 9839083
    Itmann No 5 · 4609569

    30 CFR 75.220(a)(1) · $209.00 proposed penalty

  18. Preshift examination at fixed intervals.

    violationRecord 9839082
    Itmann No 5 · 4609569

    30 CFR 75.360(g) · $151.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F01D4C6
    Itmann No 5 · 4609569

    103(i) · 6.0 on-site hours reported

  20. Preshift examination at fixed intervals.

    violationRecord 5090928
    Itmann No 5 · 4609569

    30 CFR 75.360(g) · $151.00 proposed penalty

  21. Preshift examination at fixed intervals.

    violationRecord 5090927
    Itmann No 5 · 4609569

    30 CFR 75.360(g) · $151.00 proposed penalty

  22. Intentional changes in the ventilation system.

    violationRecord 5090926
    Itmann No 5 · 4609569

    30 CFR 75.324(b)(2) · $1,550.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5090597
    Itmann No 5 · 4609569

    30 CFR 75.202(a) · Significant and substantial (S&S) · $697.00 proposed penalty

  24. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5090596
    Itmann No 5 · 4609569

    30 CFR 75.1101-10 · $151.00 proposed penalty

  25. Preshift examination at fixed intervals.

    violationRecord 5090595
    Itmann No 5 · 4609569

    30 CFR 75.360(g) · $818.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.