Itmann Mining Company LP safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
Itmann No 5 · 460956930 CFR 75.1731(a) · $151.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $465.00 proposed penalty
On-shift examination.
Itmann No 5 · 460956930 CFR 75.362(g)(2)(i) · $151.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 5.5 on-site hours reported
Mine ventilation plan; submission and approval.
Itmann No 5 · 460956930 CFR 75.370(a)(1) · $432.00 proposed penalty
Permissible electric face equipment; maintenance.
Itmann No 5 · 460956930 CFR 75.503 · $193.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 5.5 on-site hours reported
Mine ventilation plan; submission and approval.
Itmann No 5 · 460956930 CFR 75.370(a)(1) · $193.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 6.8 on-site hours reported
Temporary notations, revisions, and supplements.
Itmann No 5 · 460956930 CFR 75.1202-1(b)(3) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Itmann No 5 · 460956930 CFR 75.370(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $165.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 8.0 on-site hours reported
Automatic fire sensor and warning device systems; installation; minimum requirements.
Itmann No 5 · 460956930 CFR 75.1103-4(a)(1)(i) · $177.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
Itmann No 5 · 460956930 CFR 75.701 · $267.00 proposed penalty
Face ventilation control devices.
Itmann No 5 · 460956930 CFR 75.330(b)(1)(i) · $1,320.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $366.00 proposed penalty
Travelways at surface installations.
Itmann No 5 · 460956930 CFR 77.205(b) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Itmann No 5 · 460956930 CFR 77.502 · $151.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Itmann No 5 · 460956930 CFR 75.1731(a) · $151.00 proposed penalty
Mechanical equipment guards.
Itmann No 5 · 460956930 CFR 75.1722(c) · $1,320.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 8.5 on-site hours reported
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Itmann No 5 · 460956930 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $165.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.