ICG TYGART VALLEY safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
LEER MINE · 460919230 CFR 75.370(a)(1) · $151.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
LEER MINE · 460919230 CFR 75.1911(h) · $151.00 proposed penalty
Accumulation of combustible materials.
LEER MINE · 460919230 CFR 75.400 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
LEER MINE · 460919230 CFR 75.1731(a) · $245.00 proposed penalty
Atmospheric monitoring systems.
LEER MINE · 460919230 CFR 75.351(e)(1)(iv) · $642.00 proposed penalty
Other safeguards.
LEER MINE · 460919230 CFR 75.1403 · $151.00 proposed penalty
Other safeguards.
LEER MINE · 460919230 CFR 75.1403 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
LEER MINE · 460919230 CFR 72.630(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
LEER MINE · 460919230 CFR 75.370(a)(1) · $151.00 proposed penalty
On-shift examination.
LEER MINE · 460919230 CFR 75.362(g)(2) · $151.00 proposed penalty
Other safeguards.
LEER MINE · 460919230 CFR 75.1403 · $151.00 proposed penalty
Condition and examination of firefighting equipment.
LEER MINE · 460919230 CFR 75.1100-3 · $151.00 proposed penalty
Spot Inspections
LEER MINE · 4609192103(i) · 5.0 on-site hours reported
Electrical Technical Investigation
LEER MINE · 46091923.0 on-site hours reported
Spot Inspections
LEER MINE · 4609192103(i) · 3.5 on-site hours reported
Violation — cited standard not reported
LEER MINE · 4609192$714.00 proposed penalty
Impoundment Spot Inspection
Leer Prep Plant · 46091915.0 on-site hours reported
Other safeguards.
LEER MINE · 460919230 CFR 75.1403 · $151.00 proposed penalty
Other safeguards.
LEER MINE · 460919230 CFR 75.1403 · $336.00 proposed penalty
Shaft, Slope or Major Construction Spot Inspection
LEER MINE · 460919218.8 on-site hours reported
Compliance with approved slope and shaft sinking plans.
LEER MINE · 460919230 CFR 77.1900-1 · $1,550.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
LEER MINE · 460919230 CFR 75.1731(a) · $245.00 proposed penalty
Criteria—Haulage; general.
LEER MINE · 460919230 CFR 75.1403-10(e) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
LEER MINE · 460919230 CFR 75.403 · $313.00 proposed penalty
Spot Inspections
LEER MINE · 4609192103(i) · 7.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.