← ICG TYGART VALLEY

ICG TYGART VALLEY safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 9934398
    LEER MINE · 4609192

    30 CFR 75.400 · $165.00 proposed penalty

  2. Power wires and cables; insulation and protection.

    violationRecord 9934397
    LEER MINE · 4609192

    30 CFR 75.517 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  3. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9934396
    LEER MINE · 4609192

    30 CFR 75.1107-9(a)(2) · $151.00 proposed penalty

  4. Spot Inspections

    inspectionRecord F016757
    LEER MINE · 4609192

    103(i) · 10.0 on-site hours reported

  5. Automatic couplers.

    violationRecord 9934395
    LEER MINE · 4609192

    30 CFR 75.1405 · Significant and substantial (S&S) · $432.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 9934394
    LEER MINE · 4609192

    30 CFR 75.400 · Significant and substantial (S&S) · $818.00 proposed penalty

  7. Handling of materials

    accidentRecord 220261070002
    LEER MINE · 4609192

    Days away from work only

    Accident narrative

    While extending the slider from the tube, the employees arm was drawn into the tube, resulting in the employees left forearm striking the tube.

  8. Spot Inspections

    inspectionRecord F018E52
    LEER MINE · 4609192

    103(i) · 7.8 on-site hours reported

  9. Permissible electric face equipment; maintenance.

    violationRecord 9938268
    LEER MINE · 4609192

    30 CFR 75.503 · $151.00 proposed penalty

  10. Drill dust control at underground areas of underground mines.

    violationRecord 9938267
    LEER MINE · 4609192

    30 CFR 72.630(b) · $151.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F016753
    LEER MINE · 4609192

    103(i) · 10.0 on-site hours reported

  12. Regular Safety and Health Inspection

    inspectionRecord F018E4F
    LEER MINE · 4609192

    264.8 on-site hours reported

  13. Spot Inspections

    inspectionRecord F018E4E
    LEER MINE · 4609192

    103(i) · 6.8 on-site hours reported

  14. Accumulation of combustible materials.

    violationRecord 9938266
    LEER MINE · 4609192

    30 CFR 75.400 · $336.00 proposed penalty

  15. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9938265
    LEER MINE · 4609192

    30 CFR 75.1731(a) · $151.00 proposed penalty

  16. Explosives, handling and use.

    violationRecord 9938262
    LEER MINE · 4609192

    30 CFR 77.1303(d) · $151.00 proposed penalty

  17. Machinery and equipment; operation and maintenance.

    violationRecord 9935391
    LEER MINE · 4609192

    30 CFR 75.1725(a) · $151.00 proposed penalty

  18. Drill dust control at underground areas of underground mines.

    violationRecord 9935390
    LEER MINE · 4609192

    30 CFR 72.630(b) · $151.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9935389
    LEER MINE · 4609192

    30 CFR 75.400 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  20. Criteria—Belt conveyors.

    violationRecord 9935388
    LEER MINE · 4609192

    30 CFR 75.1403-5(g) · Significant and substantial (S&S) · $959.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F01996F
    LEER MINE · 4609192

    103(i) · 8.3 on-site hours reported

  22. Spot Inspections

    inspectionRecord F018E4C
    LEER MINE · 4609192

    103(i) · 6.3 on-site hours reported

  23. Methane monitors.

    violationRecord 9938261
    LEER MINE · 4609192

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 9938260
    LEER MINE · 4609192

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  25. Other safeguards.

    violationRecord 9938259
    LEER MINE · 4609192

    30 CFR 75.1403 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.