ICG TYGART VALLEY safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
LEER MINE · 460919230 CFR 75.400 · $165.00 proposed penalty
Power wires and cables; insulation and protection.
LEER MINE · 460919230 CFR 75.517 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
LEER MINE · 460919230 CFR 75.1107-9(a)(2) · $151.00 proposed penalty
Spot Inspections
LEER MINE · 4609192103(i) · 10.0 on-site hours reported
Automatic couplers.
LEER MINE · 460919230 CFR 75.1405 · Significant and substantial (S&S) · $432.00 proposed penalty
Accumulation of combustible materials.
LEER MINE · 460919230 CFR 75.400 · Significant and substantial (S&S) · $818.00 proposed penalty
Handling of materials
LEER MINE · 4609192Days away from work only
Accident narrative
While extending the slider from the tube, the employees arm was drawn into the tube, resulting in the employees left forearm striking the tube.
Spot Inspections
LEER MINE · 4609192103(i) · 7.8 on-site hours reported
Permissible electric face equipment; maintenance.
LEER MINE · 460919230 CFR 75.503 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
LEER MINE · 460919230 CFR 72.630(b) · $151.00 proposed penalty
Spot Inspections
LEER MINE · 4609192103(i) · 10.0 on-site hours reported
Regular Safety and Health Inspection
LEER MINE · 4609192264.8 on-site hours reported
Spot Inspections
LEER MINE · 4609192103(i) · 6.8 on-site hours reported
Accumulation of combustible materials.
LEER MINE · 460919230 CFR 75.400 · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
LEER MINE · 460919230 CFR 75.1731(a) · $151.00 proposed penalty
Explosives, handling and use.
LEER MINE · 460919230 CFR 77.1303(d) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
LEER MINE · 460919230 CFR 75.1725(a) · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
LEER MINE · 460919230 CFR 72.630(b) · $151.00 proposed penalty
Accumulation of combustible materials.
LEER MINE · 460919230 CFR 75.400 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Criteria—Belt conveyors.
LEER MINE · 460919230 CFR 75.1403-5(g) · Significant and substantial (S&S) · $959.00 proposed penalty
Spot Inspections
LEER MINE · 4609192103(i) · 8.3 on-site hours reported
Spot Inspections
LEER MINE · 4609192103(i) · 6.3 on-site hours reported
Methane monitors.
LEER MINE · 460919230 CFR 75.342(a)(4) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
LEER MINE · 460919230 CFR 75.370(a)(1) · $193.00 proposed penalty
Other safeguards.
LEER MINE · 460919230 CFR 75.1403 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.