ICG TYGART VALLEY safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Operation of diesel-powered equipment.
LEER MINE · 460919230 CFR 75.1916(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Spot Inspections
LEER MINE · 4609192103(i) · 7.5 on-site hours reported
Identification of circuit breakers.
LEER MINE · 460919230 CFR 75.904 · $193.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
LEER MINE · 460919230 CFR 75.1731(a) · $226.00 proposed penalty
Accumulation of combustible materials.
LEER MINE · 460919230 CFR 75.400 · $336.00 proposed penalty
Accumulation of combustible materials.
LEER MINE · 460919230 CFR 75.400 · Significant and substantial (S&S) · $755.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
LEER MINE · 460919230 CFR 75.1731(a) · $151.00 proposed penalty
Fall of roof or back
LEER MINE · 4609192Accident only
Accident narrative
The mine experienced a roof fall in the 2 Right track entry, at 4 block, in an outby intersection. The dimensions of the fall were 35'x45'x13.5' (approx.) No injuries occurred from this incident.
Spot Inspections
LEER MINE · 4609192103(i) · 7.5 on-site hours reported
Other safeguards.
LEER MINE · 460919230 CFR 75.1403 · $151.00 proposed penalty
Spot Inspections
LEER MINE · 4609192103(i) · 8.0 on-site hours reported
Accumulation of combustible materials.
LEER MINE · 460919230 CFR 75.400 · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
LEER MINE · 460919230 CFR 75.1731(a) · $226.00 proposed penalty
Spot Inspections
LEER MINE · 4609192103(i) · 7.5 on-site hours reported
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
LEER MINE · 460919230 CFR 75.1714-3(a) · $193.00 proposed penalty
Spot Inspections
LEER MINE · 4609192103(i) · 7.5 on-site hours reported
Methane monitors.
LEER MINE · 460919230 CFR 75.342(a)(4) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
LEER MINE · 460919230 CFR 75.370(a)(1) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
LEER MINE · 460919230 CFR 75.1725(a) · $193.00 proposed penalty
Verbal Hazard Complaint Inspections
LEER MINE · 460919212.5 on-site hours reported
Escapeways; bituminous and lignite mines.
LEER MINE · 460919230 CFR 75.380(d)(1) · $209.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
LEER MINE · 460919230 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
LEER MINE · 460919230 CFR 75.380(d)(1) · $209.00 proposed penalty
Slip or fall of person
LEER MINE · 4609192Days away from work only
Accident narrative
EE was carrying V-Deck and stepped over a beam on the ground. As EE stepped over, EE twisted EE's ankle. Injury was not the result of a training or compliance issue.
Slip or fall of person
LEER MINE · 4609192Days away from work only
Accident narrative
Employee was standing on overcast steps while adjusting a bottom roller. EE's left leg slipped on the step, causing EE to twist EE's left knee and fall down the steps. The results from the MRI revealed a torn meniscus.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.