ICG TYGART VALLEY safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Preshift examination at fixed intervals.
LEER MINE · 460919230 CFR 75.360(g) · $193.00 proposed penalty
Regular Safety and Health Inspection
Leer Prep Plant · 460919169.3 on-site hours reported
Electric equipment; examination, testing, and maintenance.
Leer Prep Plant · 460919130 CFR 77.502 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Leer Prep Plant · 460919130 CFR 77.502 · Significant and substantial (S&S) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
LEER MINE · 460919230 CFR 75.517 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Spot Inspections
LEER MINE · 4609192103(i) · 7.5 on-site hours reported
Accumulation of combustible materials.
LEER MINE · 460919230 CFR 75.400 · $151.00 proposed penalty
Machinery
LEER MINE · 4609192Days away from work only
Accident narrative
Employee was bolting in the #2 entry and just finished installing a bolt. Employee had a drill steel in right hand while dropping the head of the machine towards the mine floor. The drill steel that was resting on the employee's right foot became stuck under the pot of the machine and pushed the drill steel in through the top of the right foot.
Slip or fall of person
LEER MINE · 4609192No dys awy frm wrk,no rstr act
Accident narrative
Employee was carrying pie-pans on longwall teardown. EE tripped on the relay bar and fell. Employee struck EE's chin on the pie-pans resulting in a laceration on EE's chin. Employee received 4 sutures as a result of the injury.
Spot Inspections
LEER MINE · 4609192103(i) · 7.5 on-site hours reported
Other safeguards.
LEER MINE · 460919230 CFR 75.1403 · $336.00 proposed penalty
Power wires and cables; insulation and protection.
LEER MINE · 460919230 CFR 75.517 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Other safeguards.
LEER MINE · 460919230 CFR 75.1403 · $336.00 proposed penalty
Other safeguards.
LEER MINE · 460919230 CFR 75.1403 · $336.00 proposed penalty
Handling of materials
LEER MINE · 4609192Days away from work only
Accident narrative
Employee was tightening chains on the tires for the section scoop. While cleaning up from the job, EE moved the fairlead from the scoop and placed it on the toolbox. The fairlead slid off the toolbox and employee tried to catch it, smashing EE's right ring finger between the fairlead and the mine floor resulting in a laceration at EE's last knuckle.
Spot Inspections
LEER MINE · 4609192103(i) · 7.5 on-site hours reported
Belt air course ventilation.
LEER MINE · 460919230 CFR 75.350(a)(2) · $151.00 proposed penalty
Automatic emergency-parking brakes.
LEER MINE · 460919230 CFR 75.523-3(c)(2) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
LEER MINE · 460919230 CFR 75.503 · $151.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
LEER MINE · 460919230 CFR 75.601-1 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
LEER MINE · 460919230 CFR 75.512 · Significant and substantial (S&S) · $10,569.00 proposed penalty
Inspection of fire suppression devices.
LEER MINE · 460919230 CFR 75.1107-16(b) · $642.00 proposed penalty
Accumulation of combustible materials.
LEER MINE · 460919230 CFR 75.400 · $151.00 proposed penalty
Power wires and cables; insulation and protection.
LEER MINE · 460919230 CFR 75.517 · Significant and substantial (S&S) · $3,736.00 proposed penalty
Fire suppression devices; extinguishant supply systems.
LEER MINE · 460919230 CFR 75.1107-8(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.