Air quality detectors and measurement devices.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.320(a) · $432.00 proposed penalty
On-shift examination.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.362(g)(2)(i) · $151.00 proposed penalty
Multi-gas detectors.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1714-7(a) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.370(a)(1) · $883.00 proposed penalty
Preshift examination at fixed intervals.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.360(g) · $151.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 7.0 on-site hours reported
Methane monitors.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.342(a)(4) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.517 · $1,431.00 proposed penalty
Quantity and location of firefighting equipment.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1100-2(f) · $193.00 proposed penalty
Verbal Hazard Complaint Inspections
BECKLEY POCAHONTAS MINE · 46052525.0 on-site hours reported
Belt air course ventilation.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.350(a)(2) · $1,126.00 proposed penalty
Fall of roof or back
BECKLEY POCAHONTAS MINE · 4605252Accident only
Accident narrative
A roof fall occurred near Spad # 34462 on Panel D1 (5A Belt Break #38) of the active Section No. 5 at 10:55AM. This fall was in the LOB where the miner was loading at the time. The fall is approximately 20ft X 35ft X 7 to 8 feet thick. The fall has covered the right continuous mining machine.
Non-Injury Accident Investigation
BECKLEY POCAHONTAS MINE · 460525212.5 on-site hours reported
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 5.0 on-site hours reported
Violation — cited standard not reported
BECKLEY POCAHONTAS MINE · 4605252Verbal Hazard Complaint Inspections
BECKLEY POCAHONTAS MINE · 46052528.0 on-site hours reported
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 7.0 on-site hours reported
Mine ventilation plan; submission and approval.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.370(a)(1) · $267.00 proposed penalty
Accumulation of combustible materials.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.400 · $288.00 proposed penalty
Regular Safety and Health Inspection
BECKLEY POCAHONTAS MINE · 4605252537.3 on-site hours reported
Spot Inspection
BECKLEY POCAHONTAS MINE · 46052522.5 on-site hours reported
Spot Inspection
Beckley Pocahontas Plant · 460921612.0 on-site hours reported
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 7.5 on-site hours reported
Power wires and cables; insulation and protection.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.517 · $193.00 proposed penalty
Roof bolting.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.204(c)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.