  1. Maintenance of diesel-powered equipment.

    violationRecord 5021120
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1914(e) · $288.00 proposed penalty

  2. Electric equipment and circuits; overload and short circuit protection.

    violationRecord 5021119
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.518 · $432.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5021118
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  4. Fall of roof or back

    accidentRecord 220260140006
    BECKLEY POCAHONTAS MINE · 4605252

    No dys awy frm wrk,no rstr act

    Accident narrative

    While bent over putting oil in bolter a piece of roof rock fell and hit them on their arm/shoulder. Because they were bent over in the walkway of the machine, the rock fell perpendicular and broke across the machine. The initial rock measured approximately 77" long, 36" wide, and 2 �" thick. Mining height in this area is 13'.

  5. Spot Inspections

    inspectionRecord F020A5A
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 14.3 on-site hours reported

  6. Methane monitors.

    violationRecord 5099298
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.342(a)(4) · $549.00 proposed penalty

  7. Roof control plan.

    violationRecord 5099297
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $9,004.00 proposed penalty

  8. Roof control plan.

    violationRecord 5099296
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.220(a)(1) · $9,004.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 5092843
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.202(a) · $1,679.00 proposed penalty

  10. Inspection of fire suppression devices.

    violationRecord 5021117
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5021116
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $267.00 proposed penalty

  12. Electric equipment; examination, testing and maintenance.

    violationRecord 5092844
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512 · $465.00 proposed penalty

  13. Frequency of examinations.

    violationRecord 5092842
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512-2 · $1,037.00 proposed penalty

  14. Proximity detection systems.

    violationRecord 5092841
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1732(a) · $2,133.00 proposed penalty

  15. Electric equipment; examination, testing and maintenance.

    violationRecord 5092840
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512 · $465.00 proposed penalty

  16. Electric equipment; examination, testing and maintenance.

    violationRecord 5092839
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512 · $193.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 5021115
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512 · $193.00 proposed penalty

  18. Roof control plan.

    violationRecord 5021114
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.220(a)(1) · $818.00 proposed penalty

  19. Temporary, portable containers.

    violationRecord 5020836
    Beckley Pocahontas Plant · 4609216

    30 CFR 47.44(b) · $151.00 proposed penalty

  20. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5020835
    Beckley Pocahontas Plant · 4609216

    30 CFR 77.1606(c) · $151.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord 6322591
    BECKLEY POCAHONTAS MINE · 4605252

    732.5 on-site hours reported

  22. Protection from falls of roof, face and ribs.

    violationRecord 5022639
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5022638
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $267.00 proposed penalty

  24. Spot Inspection

    inspectionRecord 6322282
    BECKLEY POCAHONTAS MINE · 4605252

    18.5 on-site hours reported

  25. Protection from falls of roof, face and ribs.

    violationRecord 5027800
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.202(a) · $1,679.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.